— 7 —
17-1. Mechanical Shutter Data Input
(DCR-TRV6/TRV6E/TRV11/TRV11E) ························ 5-31
17-2. Mechanical Shutter Data Input
(DCR-TRV20/TRV20E) ················································ 5-32
18.
Angular Velocity Sensor Sensitivity Adjustment ·········· 5-32
1-4.
COLOR ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT ····························································· 5-33
ADJUSTMENT ····························································· 5-33
1.
VCO Adjustment (VC-240/241 board) ························· 5-33
2.
RGB AMP Adjustment (VC-240/241 board) ················ 5-34
3.
Contrast Adjustment (VC-240/241 board) ···················· 5-34
4.
Backlight Consumption Current Adjustment
(VC-240/241 board) ······················································ 5-35
(VC-240/241 board) ······················································ 5-35
5.
White Balance Adjustment (VC-240/241 board) ·········· 5-35
1-5.
LCD SYSTEM ADJUSTMENT ··································· 5-36
1-5-1. LCD SYSTEM ADJUSTMENT
(DCR-TRV11/TRV11E/TRV20) ··································· 5-36
1.
VCO Adjustment (PD-123 board) ································· 5-36
2.
RGB AMP Adjustment (PD-123 board) ························ 5-37
3.
Contrast Adjustment (PD-123 board) ···························· 5-37
4.
V-COM Level Adjustment (PD-123 board) ·················· 5-38
5.
V-COM Adjustment (PD-123 board) ···························· 5-38
6.
White Balance Adjustment (PD-123 board) ·················· 5-39
1-5-2. LCD SYSTEM ADJUSTMENT
(DCR-TRV6/TRV6E/TRV20E) ····································· 5-39
1.
VCO Adjustment (PD-124 board) ································· 5-39
2.
Bright Adjustment (PD-124 board) ······························· 5-40
3.
Black Limit Adjustment (PD-124 board) ······················ 5-40
4.
Contrast Adjustment (PD-124 board) ···························· 5-41
5.
Center Level Adjustment (PD-124 board) ····················· 5-41
6.
V-COM Adjustment (PD-124 board) ···························· 5-42
7.
White Balance Adjustment (PD-124 board) ·················· 5-42
5-2.
MECHANISM SECTION ADJUSTMENT ·················· 5-43
2-1.
HOW TO ENTER RECORD MODE WITHOUT
CASSETTE ··································································· 5-43
CASSETTE ··································································· 5-43
2-2.
HOW TO ENTER PLAYBACK MODE WITHOUT
CASSETTE ··································································· 5-43
CASSETTE ··································································· 5-43
2-3.
TAPE PATH ADJUSTMENT ········································ 5-43
1.
Preparation for Adjustment ··········································· 5-43
2.
Procedure after operations ············································· 5-43
5-3.
VIDEO SECTION ADJUSTMENTS ··························· 5-44
3-1.
PREPARATIONS BEFORE ADJUSTMENTS ············ 5-44
3-1-1. Equipment Required ······················································ 5-44
3-1-2. Precautions on Adjusting ··············································· 5-45
3-1-3. Adjusting Connectors ···················································· 5-46
3-1-4. Connecting the Equipment ············································ 5-46
3-1-5. Checking the Input Signals (Except AEP/UK model) ··· 5-46
3-1-6. Alignment Tapes ···························································· 5-47
3-1-7. Input/Output Level and Impedance ······························· 5-47
3-2.
3-1-2. Precautions on Adjusting ··············································· 5-45
3-1-3. Adjusting Connectors ···················································· 5-46
3-1-4. Connecting the Equipment ············································ 5-46
3-1-5. Checking the Input Signals (Except AEP/UK model) ··· 5-46
3-1-6. Alignment Tapes ···························································· 5-47
3-1-7. Input/Output Level and Impedance ······························· 5-47
3-2.
SYSTEM CONTROL SYSTEM ADJUSTMENT ········ 5-48
1.
Initialization of B, C, D, E, F, 7, 8 Page Data ··············· 5-48
2.
Serial No. Input ····························································· 5-48
2-1.
Company ID Input ························································· 5-48
2-2.
Serial No. Input ····························································· 5-48
3.
Battery End Check (VC-240/241 board) ······················· 5-50
3-3.
SERVO AND RF SYSTEM ADJUSTMENT ··············· 5-51
1.
Cap FG Duty Adjustment (VC-240/241 board) ············ 5-51
2.
PLL f
0
& LPF f
0
Adjustment (VC-240/241 board) ······· 5-51
3.
Switching Position Adjustment (VC-240/241 board) ··· 5-52
4.
AGC Center Level and APC & AEQ Adjustment ········· 5-52
4-1.
Preparations before adjustments ···································· 5-52
4-2.
AGC Center Level Adjustment (VC-240/241 board) ···· 5-52
4-3.
APC & AEQ Adjustment (VC-240/241 board) ············· 5-53
4-4.
Processing after Completing Adjustments ···················· 5-53
5.
PLL f
0
& LPF f
0
Final Adjustment
(VC-240/241 board) ······················································ 5-53
3-4.
VIDEO SYSTEM ADJUSTMENTS ····························· 5-54
3-4-1. Base Band Block Adjustments ······································ 5-54
1.
Chroma BPF f
0
Adjustment (VC-240/241 Board) ········ 5-54
2.
S VIDEO OUT Y Level Adjustment
(VC-240/241 Board) ······················································ 5-54
(VC-240/241 Board) ······················································ 5-54
3.
S VIDEO OUT Chroma Level Adjustment
(VC-240/241 Board) ······················································ 5-55
(VC-240/241 Board) ······················································ 5-55
4.
AV OUT Y, Chroma Level Check (VC-240/241 Board) ·· 5-55
3-4-2. BIST Check ··································································· 5-56
1.
1.
Playback System Check ················································ 5-56
1-1.
Preparations for Playback ·············································· 5-56
1-2.
IC301 TRX (RF) PB BIST Check ································· 5-56
1-3.
IC301 AUD (ABUS) PB BIST Check ··························· 5-56
1-4.
IC301 VFD PB BIST Check ········································· 5-56
1-5.
IC301 ENCODER BIST Check ···································· 5-57
1-6.
Processing after Completing Playback System Check ·· 5-58
2.
Recording System Check ·············································· 5-59
2-1.
Preparations for recording ············································· 5-59
2-2.
IC301 TRX (RF) BIST Check ······································· 5-59
2-3.
Processing after Completing Recording System Check ·· 5-59
3-5.
IR TRANSMITTER ADJUSTMENTS ························· 5-60
1.
IR Video Carrier Frequency Adjustment
(VC-240/241 board) ······················································ 5-60
(VC-240/241 board) ······················································ 5-60
2.
IR Video Deviation Adjustment (VC-240/241 board) ··· 5-60
3.
IR Audio Deviation Adjustment (VC-240/241 board) ·· 5-61
3-6.
AUDIO SYSTEM ADJUSTMENTS ···························· 5-62
1.
Playback Level Check ··················································· 5-63
2.
Overall Level Characteristics Check ····························· 5-63
3.
Overall Distortion Check ··············································· 5-63
4.
Overall Noise Level Check ············································ 5-63
5.
Overall Separation Check ·············································· 5-63
5-4.
SERVICE MODE ·························································· 5-64
4-1.
ADJUSTMENT REMOTE COMMANDER ················ 5-64
1.
Using the adjustment remote commander ····················· 5-64
2.
Precautions upon using the adjustment remote
commander ···································································· 5-64
commander ···································································· 5-64
4-2.
DATA PROCESS ··························································· 5-65
4-3.
SERVICE MODE ·························································· 5-66
1.
Setting the Test Mode ···················································· 5-66
2.
Emergence Memory Address ········································ 5-66
2-1.
EMG Code (Emergency Code) ····································· 5-66
2-2.
MSW Code ···································································· 5-67
3.
Bit value discrimination ················································ 5-68
4.
Switch check (1) ···························································· 5-68
5.
Switch check (2) ···························································· 5-69
6.
Record of Use check ······················································ 5-69
6.
REPAIR PARTS LIST
6-1-1. FRONT PANEL BLOCK ASSEMBLY AND
BATTERY PANEL SECTION ········································ 6-1
6-1-2. CABINET (R) BLOCK ASSEMBLY ····························· 6-2
6-1-3. LCD BLOCK ASSEMBLY (TRV6/TRV6E MODEL) ··· 6-3
6-1-4. LCD BLOCK ASSEMBLY
6-1-3. LCD BLOCK ASSEMBLY (TRV6/TRV6E MODEL) ··· 6-3
6-1-4. LCD BLOCK ASSEMBLY
(TRV11/TRV11E/TRV20/TRV20E MODEL) ················ 6-4
6-1-5. CABINET (L) SECTION ················································ 6-5
6-1-6. CABINET (L) SECTION-2 ············································ 6-6
6-1-7. LENS BLOCK ASSEMBLY AND
6-1-6. CABINET (L) SECTION-2 ············································ 6-6
6-1-7. LENS BLOCK ASSEMBLY AND
EVF BLOCK ASSEMBLY ············································· 6-7
6-1-8. CASSETTE COMPARTMENT AND
DRUM BLOCK ASSEMBLY ········································· 6-8
6-1-9. LS CHASSIS ASSEMBLY ············································· 6-9
6-1-10. MECHANISM CHASSIS BLOCK ASSEMBLY ······ 6-10
6-2.
6-1-10. MECHANISM CHASSIS BLOCK ASSEMBLY ······ 6-10
6-2.
ELECTRICAL PARTS LIST ········································ 6-11
Parts list of the VC-240/241 board are not shown.
Pages from 6-23 to 6-44 are not shown.
Pages from 6-23 to 6-44 are not shown.
*
Optical axis frame and color reproduction frame are
shown on page 247 to 249.
shown on page 247 to 249.
Click on the first or last page to see other DCR-TRV11 / DCR-TRV11E / DCR-TRV20 / DCR-TRV20E / DCR-TRV6 / DCR-TRV6E (serv.man3) service manuals if exist.