DCR-PC115, DCR-PC115E, DCR-PC120BT, DCR-PC120E - Sony Movie Service Manual (repair manual). Page 6

Read Sony DCR-PC115 / DCR-PC115E / DCR-PC120BT / DCR-PC120E Service Manual online

— 6 —
DCR-PC115/PC115E/PC120BT/PC120E
10.
Color Reproduction Adjustment ···································· 5-27
11.
Auto White Balance & LV Standard Data Input ··········· 5-28
12.
Auto White Balance Adjustment ··································· 5-29
13.
White Balance Check ···················································· 5-30
14.
Mechanical Shutter Adjustment ···································· 5-31
15.
Steady Shot Check ························································· 5-31
16.
Strobe Light Level Adjustment ····································· 5-32
17.
Strobe White Balance Adjustment & Check ················· 5-33
18.
AF Laser Output Adjustment ········································ 5-34
19.
AF Laser Optical Axis Adjustment ······························· 5-35
1-4.
COLOR ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT ····························································· 5-36
1.
VCO Adjustment (VM-027 board) ································ 5-36
2.
Backlight Adjustment (VM-027 board) ························ 5-37
3.
Bright Adjustment (VM-027 board) ······························ 5-37
4.
Contrast Adjustment (VM-027 board) ·························· 5-38
5.
White Balance Adjustment (VM-027 board) ················ 5-38
1-5.
LCD SYSTEM ADJUSTMENT ··································· 5-39
1.
VCO Adjustment (PD-148 board) ································· 5-39
2.
Bright Adjustment (PD-148 board) ······························· 5-40
3.
Black Limit Adjustment (PD-148 board) ······················ 5-40
4.
PSIG GRAY Adjustment (PD-148 board) ····················· 5-41
5.
Contrast Adjustment (PD-148 board) ···························· 5-41
6.
Center Level Adjustment (PD-148 board) ····················· 5-42
7.
V-COM Adjustment (PD-148 board) ···························· 5-42
8.
White Balance Adjustment (PD-148 board) ·················· 5-43
5-2.
MECHANISM SECTION ADJUSTMENT ·················· 5-44
2-1.
HOW TO ENTER RECORD MODE WITHOUT
CASSETTE ··································································· 5-44
2-2.
HOW TO ENTER PLAYBACK MODE WITHOUT
CASSETTE ··································································· 5-44
2-3.
TAPE PATH ADJUSTMENT ········································ 5-44
1.
Preparation for Adjustment ··········································· 5-44
2.
Procedure after operations ············································· 5-44
5-3.
VIDEO SECTION ADJUSTMENTS ··························· 5-45
3-1.
PREPARATIONS BEFORE ADJUSTMENTS ············ 5-45
3-1-1. Equipment Required ······················································ 5-45
3-1-2. Precautions on Adjusting ··············································· 5-46
3-1-3. Adjusting Connectors ···················································· 5-47
3-1-4. Connecting the Equipment ············································ 5-47
3-1-5. Alignment Tapes ···························································· 5-48
3-1-6. Input/Output Level and Impedance ······························· 5-48
3-2.
SYSTEM CONTROL SYSTEM ADJUSTMENT ········ 5-49
1.
Initialization of B, C, D, E, F, 7, 8 Page Data ··············· 5-49
2.
Serial No. Input ····························································· 5-49
2-1.
Company ID Input ························································· 5-49
2-2.
Serial No. Input ····························································· 5-49
3-3.
SERVO AND RF SYSTEM ADJUSTMENT ··············· 5-51
1.
Cap FG Duty Adjustment (VC-270 board) ··················· 5-51
2.
PLL f
0
 & LPF f
0
 Adjustment (VC-270 board) ·············· 5-51
3.
Switching Position Adjustment (VC-270 board) ··········· 5-52
4.
AGC Center Level and APC & AEQ Adjustment ········· 5-52
4-1.
Preparations before adjustments ···································· 5-52
4-2.
AGC Center Level Adjustment (VC-270 board) ··········· 5-53
4-3.
APC & AEQ Adjustment (VC-270 board) ···················· 5-53
4-4.
Processing after Completing Adjustments ···················· 5-54
5.
PLL f
0
 & LPF f
0
 Fine Adjustment (VC-270 board) ······ 5-54
3-4.
VIDEO SYSTEM ADJUSTMENTS ····························· 5-55
1.
Chroma BPF f
0
 Adjustment (VC-270 board) ················ 5-55
2.
S VIDEO OUT Y Level Adjustment (VC-270 board) ··· 5-55
3.
S VIDEO OUT Chroma Level Adjustment
(VC-270 board) ····························································· 5-56
4.
VIDEO OUT Y, Chroma Level Check (VC-270 board) ·· 5-56
3-5.
AUDIO SYSTEM ADJUSTMENTS ···························· 5-57
1.
Playback Level Check ··················································· 5-58
2.
Overall Level Characteristics Check ····························· 5-58
3.
Overall Distortion Check ··············································· 5-58
4.
Overall Noise Level Check ············································ 5-58
5.
Overall Separation Check ·············································· 5-58
5-4.
SERVICE MODE ·························································· 5-59
4-1.
ADJUSTMENT REMOTE COMMANDER ················ 5-59
1.
Using the adjustment remote commander ····················· 5-59
2.
Precautions upon using the adjustment remote
commander ···································································· 5-59
4-2.
DATA PROCESS ··························································· 5-60
4-3.
SERVICE MODE ·························································· 5-61
1.
Setting the Test Mode ···················································· 5-61
2.
Emergence Memory Address ········································ 5-61
2-1.
EMG Code (Emergency Code) ····································· 5-61
2-2.
MSW Code ···································································· 5-62
3.
Bit value discrimination ················································ 5-63
4.
Switch check (1) ···························································· 5-63
5.
Switch check (2) ···························································· 5-63
6.
Switch check (3) ···························································· 5-63
7.
Switch check (4) ···························································· 5-64
8.
Record of Use check ······················································ 5-65
9.
Record of Self-diagnosis check ····································· 5-65
6.
REPAIR PARTS LIST
6-1.
EXPLODED VIEWS ······················································ 6-1
6-1-1. OVERALL SECTION ····················································· 6-1
6-1-2. CABINET (L) SECTION ················································ 6-2
6-1-3. VTR OVERALL SECTION ············································ 6-3
6-1-4. LENS-EVF SECTION ···················································· 6-4
6-1-5. CABINET (R) SECTION-1 ············································ 6-5
6-1-6. CABINET (R) SECTION-2 ············································ 6-6
6-1-7. CASSETTE COMPARTMENT AND DRUM BLOCK
ASSEMBLY ···································································· 6-7
6-1-8. LS CHASSIS BLOCK ASSEMBLY ······························· 6-8
6-1-9. MECHANISM CHASSIS BLOCK ASSEMBLY ··········· 6-9
6-2.
ELECTRICAL PARTS LIST ········································ 6-10
Parts list of the VC-270 board are not shown.
Pages from 6-14 to 6-25 are not shown.
*
Color reproduction frame is shown on page 241.
Page of 127
Display

Click on the first or last page to see other DCR-PC115 / DCR-PC115E / DCR-PC120BT / DCR-PC120E service manuals if exist.