CCD-TRV107E, CCD-TRV108E, CCD-TRV208E, CCD-TRV408E - Sony Movie Service Manual (repair manual). Page 5

Read Sony CCD-TRV107E / CCD-TRV108E / CCD-TRV208E / CCD-TRV408E Service Manual online

— 5 —
CCD-TRV107E/TRV108E/TRV208E/TRV408E
• VC-272 (CAMERA PROCESSOR AMP)(1/11)
SCHEMATIC DIAGRAM ···························· 4-35
• VC-272 (Y/C PROCESSOR)(2/11)
SCHEMATIC DIAGRAM ···························· 4-37
• VC-272 (FOCUS/ZOOM MOTOR DRIVE)(3/11)
SCHEMATIC DIAGRAM ···························· 4-39
• VC-272 (REC/PB AMP)(4/11)
SCHEMATIC DIAGRAM ···························· 4-41
• VC-272 (LINE OUT AMP)(5/11)
SCHEMATIC DIAGRAM ···························· 4-43
• VC-272 (SERVO)(6/11)
SCHEMATIC DIAGRAM ···························· 4-45
• VC-272 (MODE CONTROL, STEADY SHOT)(7/11)
SCHEMATIC DIAGRAM ···························· 4-47
• VC-272 (HI CONTROL)(8/11)
SCHEMATIC DIAGRAM ···························· 4-49
• VC-272 (AUDIO)(9/11)
SCHEMATIC DIAGRAM ···························· 4-51
• VC-272 (DC-DC CONVERTER)(10/11)
SCHEMATIC DIAGRAM ···························· 4-53
• VC-272 (CONNECTOR)(11/11)
SCHEMATIC DIAGRAM ···························· 4-55
• FP-397 FLEXIBLE BOARD ····································· 4-57
4-3.
WAVEFORMS ······························································ 4-58
4-4.
MOUNTED PARTS LOCATION ································· 4-61
5.
ADJUSTMENTS
1.
Adjusting items when replacing main parts and boards. · 5-2
5-1.
CAMERA SECTION ADJUSTMENT ··························· 5-4
1-1.
PREPARATIONS BEFORE ADJUSTMENT
(CAMERA SECTION) ··················································· 5-4
1-1-1. List of Service Tools ························································ 5-4
1-1-2. Preparations ····································································· 5-5
1-1-3. Precaution ········································································ 5-7
1.
Setting the Switch ···························································· 5-7
2.
Order of Adjustments ······················································ 5-7
3.
Subjects ··········································································· 5-7
1-2.
INITIALIZATION OF D, E, F, 7 PAGE DATA ·············· 5-8
1.
Initializing the D, E, F, 7 Page Data ································ 5-8
2.
Modification of D, E, F, 7 Page Data ······························ 5-8
3.
D Page Table ···································································· 5-8
4.
F Page table ····································································· 5-9
5.
E Page Table ·································································· 5-11
6.
7 Page Table ··································································· 5-11
1-3.
CAMERA SYSTEM ADJUSTMENTS ························ 5-12
1.
HALL Adjustment ························································· 5-12
2.
Flange Back Adjustment (Using Minipattern Box) ······· 5-13
3.
Flange Back Adjustment (Using Flange Back Adjustment
Chart and Subject More Than 500m Away) ·················· 5-14
3-1.
Flange Back Adjustment (1) ·········································· 5-14
3-2.
Flange Back Adjustment (2) ·········································· 5-14
4.
Flange Back Check ························································ 5-15
5.
Picture Frame Setting ···················································· 5-15
6.
Color Reproduction Adjustment ···································· 5-16
7.
Auto White Balance & LV Standard Data Input ··········· 5-17
8.
Auto White Balance Adjustment ··································· 5-18
9.
White Balance Check ···················································· 5-19
10.
Steady Shot Check (CCD-TRV408E) ··························· 5-20
1-4.
ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT ····························································· 5-21
1.
RGB AMP Adjustment (VF-150 board) ························ 5-22
1-1.
Automatic Adjustment ··················································· 5-22
1-2.
Manual Adjustment ······················································· 5-22
2.
Contrast Adjustment (VF-150 board) ···························· 5-23
2-1.
Automatic Adjustment ··················································· 5-23
2-2.
Manual Adjustment ······················································· 5-23
1-5.
LCD SYSTEM ADJUSTMENT ··································· 5-24
1.
VCO Adjustment (PD-156 board) ································· 5-25
2.
RGB AMP Adjustment (PD-156 board) ························ 5-25
3.
Contrast Adjustment (PD-156 board) ···························· 5-26
4.
COM AMP Adjustment (PD-156 board) ······················· 5-26
5.
V-COM Adjustment (PD-156 board) ···························· 5-27
6.
White Balance Adjustment (PD-156 board) ·················· 5-27
5-2.
MECHANISM SECTION ADJUSTMENT ·················· 5-28
2-1.
ADJUSTMENT REMOTE COMMANDER ················ 5-28
2-2.
OPERATING WITHOUT CASSETTE ························ 5-28
2-3.
TAPE PATH ADJUSTMENT ········································ 5-28
1.
Preparations for Adjustment ·········································· 5-28
5-3.
VIDEO SECTION ADJUSTMENTS ··························· 5-29
3-1.
PREPARATIONS BEFORE ADJUSTMENTS ············ 5-29
3-1-1. Equipment to Required ················································· 5-29
3-1-2. Precautions on Adjusting ··············································· 5-30
3-1-3. Adjusting Connectors ···················································· 5-31
3-1-4. Connecting the Equipment ············································ 5-31
3-1-5. Alignment Tape ····························································· 5-32
3-1-6. Output Level and Impedance ········································· 5-32
3-1-7. Recording Mode (Standard 8/Hi8) switching ··············· 5-32
3-2.
SYSTEM CONTROL SYSTEM ADJUSTMENT ········ 5-33
1.
Initialization of D, E, F, 7 Page Data ····························· 5-33
3-3.
SERVO ADJUSTMENT ··············································· 5-33
1.
CAP FG Offset Adjustment (VC-272 board) ················ 5-33
2.
Switching Position Adjustment (VC-272 board) ··········· 5-33
3-4.
VIDEO SYSTEM ADJUSTMENTS ····························· 5-34
1.
28 MHz Origin Oscillation Adjustment
(VC-272 board) ····························································· 5-34
2.
AFC f
0
 Adjustment (VC-272 board) ····························· 5-34
3.
Y OUT Level Adjustment (VC-272 board) ··················· 5-35
4.
C OUT Level Adjustment (VC-272 board) ··················· 5-35
5.
REC Y Current Adjustment (VC-272 board) ················ 5-36
6.
REC C/AFM Current Adjustment ································· 5-37
6-1.
Preparations ··································································· 5-37
6-2.
REC C Current Check (VC-272 board) ························ 5-37
6-3.
REC AFM Current Adjustment (VC-272 board) ·········· 5-38
6-4.
Processing after completed adjustment ························· 5-38
3-5.
AUDIO SYSTEM ADJUSTMENTS ···························· 5-39
1.
1.5 MHz Deviation Adjustment (VC-272 board) ·········· 5-39
2.
BPF f
0
 Adjustment (VC-272 board) ······························ 5-39
5-4.
SERVICE MODE ·························································· 5-40
4-1.
ADJUSTMENT REMOTE COMMANDER ················ 5-40
1.
Using the Adjustment Remote Commander ·················· 5-40
2.
Precautions Upon Using the Adjustment Remote
Commander ··································································· 5-40
4-2.
DATA PROCESS ··························································· 5-41
4-3.
SERVICE MODE ·························································· 5-42
1.
Test Mode Setting ·························································· 5-42
2.
Emergency Memory Address ········································ 5-43
2-1.
EMG code (Emergency code) ······································· 5-43
2-2.
MSW codes ··································································· 5-44
3.
Bit Value Discrimination ··············································· 5-45
4.
Switch check (1) ···························································· 5-45
5.
Switch check (2) ···························································· 5-45
6.
Switch check (3) ···························································· 5-46
7.
Record of Use check ······················································ 5-46
8.
Record of Self-diagnosis check ····································· 5-47
6.
REPAIR PARTS LIST
6-1.
EXPLODED VIEWS ······················································ 6-1
6-1-1. OVERALL SECTION ····················································· 6-1
6-1-2. F PANEL SECTION ······················································· 6-2
6-1-3. CABINET (L) SECTION ················································ 6-3
6-1-4. BATTERY PANEL SECTION ········································ 6-4
6-1-5. EVF SECTION ································································ 6-5
6-1-6. LENS SECTION ····························································· 6-6
6-1-7. CABINET (R) SECTION ··············································· 6-7
Page of 127
Display

Click on the first or last page to see other CCD-TRV107E / CCD-TRV108E / CCD-TRV208E / CCD-TRV408E service manuals if exist.