Read Sony CMT-C7NT / HCD-C7NT Service Manual online
13
HCD-C7NT
3-5. Front Bracket Section, Loading Motor Assy (M902)
1
fpc holder
B
2
screw
(M 2 x 2.5)
qs
screw
(+P 2 x 3.0)
9
wire clamper
qa
Move down the gear mount
bracket in the direction of the
arrow
arrow
B
.
6
screw
(+P 2 x 3)
7
screw
(M 2 x 4)
A
8
Remove it in the direction of
the arrow
A
from the left side
when viewed from the rear of
the front bracket.
the front bracket.
5
Remove the two
hang-up springs (FZ).
3
three claws
0
loading belt
4
Raise the
CONNECTOR board.
Note during re-assembling
When re-assembling, align the positions as shown.
qd
front backet section
front backet section
chassis section
qf
Remove two solderings.
qg
loading motor assy (M902)
Click on the first or last page to see other CMT-C7NT / HCD-C7NT service manuals if exist.