Read Sharp VC-MH834 (serv.man2) Service Manual online
26
VC-M314HM
VC-MH834HM
VC-MH834HM
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the PHASE-
MATCHING point
1
as shown below.
2. Install, paying attention to insert point
5
and release
point
3
.
3. For the phase matching at the insert point
1
, see the
PHASE-MATCHING point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Capstan
D.D. motor
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
point
2
Insert
point
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
point
3
Insert
point
point
4
Insert
point
point
5
Release
point
point
3
Phase-matching
point
point
1
Shaft
1
Shaft
1
Shaft
2
Insert
point
point
2
Rotation
point
point
2
Click on the first or last page to see other VC-MH834 (serv.man2) service manuals if exist.