VC-MH722HM (serv.man6). Part 4 - Mechanical adjustments and assemblies (9-27) - Sharp VCR Service Manual (repair manual). Page 17

Read Sharp VC-MH722HM (serv.man6) Service Manual online

25
VC-M522HM
VC-MH722HM
VC-MH732HM
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the PHASE-
MATCHING point 
1
 as shown below.
2. Install, paying attention to insert point 
5
 and release
point 
3
.
3. For the phase matching at the insert point  
1
, see the
PHASE-MATCHING point 
2
 as shown below.
4. Finally fix the inserts 
1
 and 
4
.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 
2
Insert
point 
1
Half round notch
Shaft 
1
Round mark
Loading gear (T)
Insert
point 
3
Insert
point 
4
Insert
point 
5
Release
point 
3
Phase-matching
point 
1
Shaft 
1
Shaft 
1
Shaft 
2
Insert
point 
2
Rotation
point 
2
Page of 19