Read Sharp VC-M321HM (serv.man2) Service Manual online
4
VC-M321HM
VC-M331HM
VC-M331HM
2. DISASSEMBLY AND REASSEMBLY
2-1 DISASSEMBLY OF MAJOR BLOCKS
TOP CABINET
: Remove 4 screws
1
.
FRONT PANEL
: Remove shuttle switch knob
2
.
Remove 2 screws
3
and 7 clips
4
.
OPERATION
: Remove 1 screw
5
. Take it out
(SHUTTLE JOG)
of connector
6
.
PWB
MECHANISM/
: Remove 2 screws
7
, 1 screw
8
, 1
MAIN PWB
screw
9
.
6
5
1
1
7
4
2
3
8
9
MAIN FRAME
OPERATION
PWB
PWB
SHUTTLE SWITCH KNOB
FRONT PANEL
MECHANISM/
MAIN PWB
MAIN PWB
TOP CABINET
5
VC-M321HM
VC-M331HM
VC-M331HM
MECHANISM CHASSIS
MAIN PWB
2-2 DISASSEMBLING THE MECHANISM/MAIN PWB ASSEMBLY
4
CASSETTE
HOUSING
HOUSING
3
2
1. When removing the mechanism from the main PWB,
remove the antenna cover 2 screws
1
, and remove the
antenna cover.
Remove the PWB bottom plate 1 screw
Remove the PWB bottom plate 1 screw
2
.
Remove the FFC cable (AA, AD, AH)
3
which connects
the PWB and the mechanism.
Take out vertically the mechanism so that it does not
damage the adjacent parts.
Take out vertically the mechanism so that it does not
damage the adjacent parts.
2. Removing the mechanism and cassette controller
Remove 2 screws
4
fixing the cassette controller to the
mechanism, and remove the cassette controller.
1
6
VC-M321HM
VC-M331HM
VC-M331HM
END SENSOR
START SENSOR
AC CONNECTOR
2-3 CARES WHEN REASSEMBLING
INSTALLING THE CASSETTE CONTROLLER
When the cassette controller is installed on the mecha-
nism, the initial setting is essential condition.
There are two initial setting methods, namely electrical and
mechanical.
1. Electrical initial setting
So as to perform initial setting of mechanism execute the
Step 1 of Installation of cassette housing. After ascertaining
the return to the initial setting position (*1) install the
cassette controller. (Conditions: When mechanism and
PWB have been installed)
When the cassette controller is installed on the mecha-
nism, the initial setting is essential condition.
There are two initial setting methods, namely electrical and
mechanical.
1. Electrical initial setting
So as to perform initial setting of mechanism execute the
Step 1 of Installation of cassette housing. After ascertaining
the return to the initial setting position (*1) install the
cassette controller. (Conditions: When mechanism and
PWB have been installed)
AE CONNECTOR
AL CONNECTOR
REC TIP SW
INSTALLING THE MECHANISM ON PWB
Lower vertically the mechanism, paying attention to the
mechanism edge, and install the mechanism with due care
so that the parts are not damaged. So as to fix the mecha-
nism to the main PWB install two housings. (Fit the antenna
cover to one of them. For other, fix the vicinity of loading
motor and solder joint side of main PWB.) Connect again
the FFC cable (AA-MH, AD-ME, AH-MH) between the
mechanism and the main PWB.
Lower vertically the mechanism, paying attention to the
mechanism edge, and install the mechanism with due care
so that the parts are not damaged. So as to fix the mecha-
nism to the main PWB install two housings. (Fit the antenna
cover to one of them. For other, fix the vicinity of loading
motor and solder joint side of main PWB.) Connect again
the FFC cable (AA-MH, AD-ME, AH-MH) between the
mechanism and the main PWB.
PARTS WHICH NEED PARTICULAR CARE
When installing the mechanism chassis on the PWB unit,
take care so as to prevent deformation due to contact of
mechanism chassis with REC TIP SW.
When installing the mechanism chassis on the PWB unit,
take care so as to prevent deformation due to contact of
mechanism chassis with REC TIP SW.
Pulley feed gear
Screwdriver
Tilt mark (*1)
Casecon
drive gear
drive gear
Drive angle of
cassette control
cassette control
2. Mechanical initial setting
Feed the pulley feed gear of loading motor with screw
driver. After ascertaining the return to the initial set position
(*1) install the cassette controller in the specified position.
(This method is applied only for the mechanism.)
Feed the pulley feed gear of loading motor with screw
driver. After ascertaining the return to the initial set position
(*1) install the cassette controller in the specified position.
(This method is applied only for the mechanism.)
7
VC-M321HM
VC-M331HM
VC-M331HM
3. FUNCTION OF MAJOR MECHANICAL PARTS (TOP VIEW)
17
15
10
27
11
5
9
14
12
8
16
13
4
6
2
7
3
1
18
No.
Function
No.
Function
1
Full erase head
2
Supply pole base ass’y
3
Tension arm ass’y
4
Idler wheel ass’y
5
Pinch drive lever ass’y
6
Supply reel disk
7
Supply main brake ass’y
8
Take-up main brake ass’y
9
Pinch drive cam
10
A/C Head ass’y
11
Reverse guide lever ass’y
12
Casecon drive gear
13
Take-up reel disk
14
Pinch roller lever ass’y
15
Drum ass’y
16
Loading motor
17
Drum motor
18
Take-up pole base ass’y
27
Fixing guide