XV-Z200E (serv.man8). Removing of major parts - Sharp Projector Service Manual (repair manual). Page 2

Read Sharp XV-Z200E (serv.man8) Service Manual online

14
XV-Z200U/E, XV-Z201E
DT-300
3. Removing the main PWB.
3-1. Remove 6 screws.
3-2. Remove each connector on the main PWB.
4. Removing the power unit.
4-1. Remove each connector on the power PWB.
4-2. Remove 2 screws, and remove the power unit fan.
4-3. Remove 3 screws, and take out the power unit as-
sembly.
4-4. Remove 6 screws, and remove  power shield.
3-2
3-2
3-1
3-2
3-2
Main PWB
(TF)
(DA)
(TD)
(BA)
(FD)
(FB)
(PG)
(FA)
(FC)
(ED)
(TC)
(TH)
(RB)
4-1
4-2
4-3
4-4
4-4
4-3
Power PWB
Power Unit Fan
Power Shield
(EC)
(EA)
(EA1)
(EB)
Page of 6
Display

Click on the first or last page to see other XV-Z200E (serv.man8) service manuals if exist.