PG-M20S (serv.man8). Removing of major parts - Sharp Projector Service Manual (repair manual). Page 2

Read Sharp PG-M20S (serv.man8) Service Manual online

14
PG-M20S
PG-M20X
3. Removing the operation PWB
3-1. Remove the two lock screws from the operation PWB and slightly raise this PWB.
3-2. Disconnect the connectors.
4. Removing the optical mechanism
4-1. Remove the two lock screws from the lamp socket.
4-2. Raise the two lamp socket lead fixtures.
4-3. Disconnect the connectors.
4-4. Remove the six lock screws from the optical mechanism.
3-2
3-1
3-1
Operation PWB unit
4-4
4-3
4-1
Optical mechanism
4-2
Page of 6
Display

Click on the first or last page to see other PG-M20S (serv.man8) service manuals if exist.