MX-RB12 (serv.man5). MX-RB12 Installation Manual - Sharp Copying Equipment Service Manual (repair manual)

mx-rb12 (serv.man5) service manual
Model
MX-RB12 (serv.man5)
Pages
3 Few pages! See other manuals at the bottom of the first or last page.
Size
1.31 MB
Type
PDF
Document
Service Manual
Brand
Device
Copying Equipment / MX-RB12 Installation Manual
File
mx-rb12-sm5.pdf
Date

Read Sharp MX-RB12 (serv.man5) Service Manual online

MX-7040N  MX-RB12 (PAPER PASS UNIT)  12 – 1
MX-7040N
Service Manual
 
[12] MX-RB12 (PAPER PASS UNIT)
1.  Unpacking
A. Packed items check
2.  Installation
NOTE: Before installation, be sure to turn both the operation and
main power switches off and disconnect the power plug
from the power outlet. Make double sure that the data lamp
on the operation panel does not light up or blink when per-
forming installation.
A. Installation of the accuride rail
1)
Fix the L plate (Packed items No.5) to the main unit with the
screw (Packed items No.1).
2)
Install the front cover right (Packed items No.8), and fix the
screw (Packed items No.1).
3)
Install the paper guide (Packed items No.7), and fix the screw
(Packed items No.3).
No.
Name
Quantity
1
M4 x 7 round-head bind screw
13
2
M4 x 10 mold tap screw
2
3
M4 x 10 S-tight bind screw
1
4
E-ring
1
5
L  plate
1
6
Accuride rail
1
7
Paper guide
1
8
Front cover right
1
9
Front cover
1
10
Left cabinet
1
11
Relay unit
1
12
Band
2
1
2
3
4
5
6
7
8
9
10
11
12
1
2
2
2
1
1
2
MX-7040N  MX-RB12 (PAPER PASS UNIT)  12 – 2
4)
Engage the accuride rail (Packed items No.6) to cut-out por-
tion of main frame. 
Install the accuride rail while pressing so that engage the pro-
jection of the main unit frame with the hole in rear side of the
accuride rail. Fix the accuride rail with the screw (Packed items
No.1).
B. Installation of the left cabinet
1)
Insert the rib of the left cabinet (Packed items No.10) into the
slit on the lower surface of the upper cabinet left. Fix the left
cabinet with the screw (Packed items No.1).
C. Installation of the paper pass unit
1)
Pull out the slide rails.
2)
Place the paper pass unit on the slide rails, and fix it with the
screw (Packed items No.1). 
Push the paper pass unit into the main unit to install.
3)
Insert the front cover (Packed items No.9) to the supporting
point, and fix it with a E-ring (Packed items No.4).
4)
Install the band (Packed items No.12), and fix the screw
(Packed items No.2) to the front cover.
1
2
1
2
2
2
2
2
2
1
1
2
1
2
1
2
MX-7040N  MX-RB12 (PAPER PASS UNIT)  12 – 3
D. Installation of the toner bottle
1)
Install the toner bottle, and close the front cover.
Y
M
C
BK
Page of 3
Display

Download Sharp MX-RB12 (serv.man5) Service Manual (Repair Manual)

Here you can read online and download Sharp MX-RB12 (serv.man5) Service Manual in PDF. MX-RB12 (serv.man5) service manual will guide through the process and help you recover, restore, fix, disassemble and repair Sharp MX-RB12 (serv.man5) Copying Equipment. Information contained in service manuals typically includes schematics / circuit diagrams, wiring diagrams, block diagrams, printed wiring boards, exploded views, parts list, disassembly / assembly, pcb.