MX-B201D (serv.man7). Service Manual - Sharp Copying Equipment Service Manual (repair manual). Page 6

Read Sharp MX-B201D (serv.man7) Service Manual online

MX-NB11  UNPACKING AND INSTALLATION  4 - 2
4)
Fit the bottom of the network board into the PWB hook.
5)
Insert the connectors of the Ether in the openings of the sheet
metal.
Note: Securely insert the LAN connector into the opening of the
plate before tightening the screw to fix the PWB.
6)
Tighten the five screws (M3 x 6) which are included together
with the MX-NB11.
7)
Make a connection between the Network Board and the main
body’s MCU PWB with the two harnesses which are included
together with the MX-NB11.
8)
Affix the sheet for the rear cabinet to the rear cabinet.
9)
Attach the rear cabinet. (Tighten the screws again.)
Note: When booting the machine for the first time after installation
of the MX-NB11, set the date and the time in the copy mode
[31] of the user program.
For the user program setting, refer to “[12] USER PRO-
GRAM” in the MX-B201D Service Manual.
Ether connectors
Page of 18
Display

Click on the first or last page to see other MX-B201D (serv.man7) service manuals if exist.