MX-7000N MX-FNX4 8 – 4
2. Installation
<Note before installation>
* When the MX-FNX4 is installed, first install the MX-RBX2, and
* When the MX-FNX4 is installed, first install the MX-RBX2, and
then install the MX-FNX4.
* When the MX-FNX4 and MX-PNX2 is installed at the same time,
first install the MX-PNX2, and then install the MX-FNX4.
* When the MX-FNX4 and MX-CFX1 is installed at the same time,
execute the installation procedure of MX-CFX1.
A. Installation of the rail
1)
Install the rail (Package part No. 5) to the saddle stitch finisher
with the fixing screws (Package part No. 1).
with the fixing screws (Package part No. 1).
2)
Install the rail reception sheet metal (Package part No. 6) to
the main unit with the fixing screws (Package part No. 3).
the main unit with the fixing screws (Package part No. 3).
B. Installation of the connection fixture F/R
1)
Install the connection fixture R (Package part No. 8) to the
main unit with the fixing screws (Package part No. 3).
main unit with the fixing screws (Package part No. 3).
2)
Install the connection fixture F (Package part No. 7) to the
main unit with the fixing screws (Package part No. 3).
main unit with the fixing screws (Package part No. 3).
C. Check of the connected position of main unit
and finisher
1)
Insert the rail of the finisher into the slit on the rail reception
sheet metal of the main unit, install the finisher.
sheet metal of the main unit, install the finisher.
2)
Remove the screw, and remove the connector cover on rear
side of the finisher.
side of the finisher.