AR-LC9. ARLC9-Service Manual - Sharp Copying Equipment Service Manual (repair manual). Page 5

Read Sharp AR-LC9 Service Manual online

AR-LC9  UNPACKING AND INSTALLATION  3 - 3
• If the rib is displaced to the left of the axis:
<1> Loosen the two screws of the adjusting caster mounting plate
attached to the lower part of the large capacity tray.
<2> Turn the knob counterclockwise viewing from the top so that
the rib is aligned with the axis.
<3> After adjustment is complete, tighten the two screws of the
adjusting caster mounting plate and push the large capacity
tray into the main unit.
C. Fixing material and packaged part removal
1) Remove the fixing material from the large capacity paper feed
tray.
2) Remove the fixing material from the packaged part, and
remove the packaged part.
D. Remove the paper feed base screw of the 
large capacity tray.
1) Slowly pull out the paper feed base tray until it stops.
2) Remove the paper feed base fixing screw (1 pc.) of the large
capacity tray.
3) Push the large capacity tray slowly into the original position.
Rib
Axis
Screws
Top view
Knob
Rib
Axis
Screws
Top view
Knob
Page of 44
Display

Click on the first or last page to see other AR-LC9 service manuals if exist.