Read Sharp AR-LC4 (serv.man7) Service Manual online
AR-LC4 PERIODIC MAINTENANCE 6 - 1
6. PREVENTIVE MAINTENANCE
Symbols used in the checklist
General Maintenance Checklist
Cleaning
Coating
Replacing
Date
W: White grease
(Molycoat)
500: every 500K copies
: Replace if deformed or
damaged.
User’s name
Serial No.
Inspector’s name
Remarks
Item to check
Cleaning
Coating
Replacing
Remarks
x 1000
Pickup roller
A
500
Feed roller
A
500
Separation roller
A
500
Drive gears (tooth face)
W
* Operational interval of the preventive maintenance (PM) is different among the copiers.
AR-651: every 460K copies
AR-810: every 500K copies
A: Cleaning with alcohol
Display