AR-F13 (serv.man2). AR-F13 Service Manual - Sharp Copying Equipment Service Manual (repair manual). Page 41

Read Sharp AR-F13 (serv.man2) Service Manual online

AR-F13 DISASSEMBLY AND ASSEMBLY 5-10
4) Push up the stack delivery roller (upper) [4] from below to free the
stack deliver roller (upper) [4] from the shaft [5].
5) Shift up the stack delivery roller (upper) [4], and then push it down to
detach the stack deliver roller (upper) [4].
6) Likewise, remove the stack delivery roller (upper) [6] at the front.
(11) Removing the Paddle
1) Remove the paddle assembly. (See 1.B.(4).)
2) Place the paddle assembly [1] as shown.
3) Turn the gear [2] in the direction of the arrow to move up the stack
delivery roller assembly (upper) [3].
4) Push up the safety guide [4] from below to free one side of the safety
guide [4] from the shaft [5].
5) Push up the safety guide [4] from below to free the safety guide [4]
from the shaft [5].
6) Remove the paddle [6] in the direction of the arrow.
7) Likewise, remove the other paddle.
[4]
[5]
[4]
[6]
[1]
[3]
[2]
[4]
[5]
[4]
[5]
[1]
Page of 64
Display

Click on the first or last page to see other AR-F13 (serv.man2) service manuals if exist.