AL-840 (serv.man8). AL800 840 Service Manual-Disassembly - Sharp Copying Equipment Service Manual (repair manual). Page 31

Read Sharp AL-840 (serv.man8) Service Manual online

(6) Remove the screw, and remove the power PWB unit (S009/
Ua001) from the base plate. 
(7) Remove the power switch (S009/Ua001/P001) and the fuse
(S009/Ua001/P002) from the power PWB unit. 
*
After-work
1) Output voltage adjustment (When any part i the power unit is
replaced.)
*
Troubles caused by improper work
1) Power abnormality
 S009/Ua002 
MCU (PCU) PWB unit
(1) Remove the rear cabinet  S001/P001  . 
(2) Remove the front upper cabinet  S001/P002  . 
(3) Remove the right cabinet  S001/P003  . 
(4) Remove the fan motor unit  S010/P001  .
(5) Remove the screw and the connector. 
(6) Remove the connector, and push the MCU (PCU) PWB unit
(S009/Ua002) inside then remove. 
*
Troubles caused by improper work
1) Machine malfunction 
 S009/Ua003 
ICU PWB interface PWB unit
 S009/Ua004 
High voltage/motor drive PWB unit
(1) Remove the base bottom base plate  S001/P008  .
(2) Remove the screw and the connector, and remove the ICU PWB
interface PWB unit (S009/Ua003) and the high voltage/motor drive
PWB unit (S009/Ua004).
S009/Ua001
S009/Ua001/P001
S009/Ua001/
P002
S009/Ua002
9 – 31
Page of 32
Display

Click on the first or last page to see other AL-840 (serv.man8) service manuals if exist.