AL-1217 (serv.man23). Setting up the unit - Sharp Copying Equipment User Guide / Operation Manual. Page 6

Read Sharp AL-1217 (serv.man23) User Guide / Operation Manual online

12
CONNECTING THE POWER CORD
1
Ensure that the power switch of 
the unit is in the OFF position. 
Insert the attached power cord 
into the power cord socket at the 
rear of the unit.
2
Plug the other end of the power cord into the nearest outlet.
Power on
Ensure that the power switch of the unit is in the OFF position. Plug the other end of 
the power cord into the nearest outlet. Turn the power switch on the left side of the 
unit to the "ON" position. The start (
) indicator will light up and other indicators 
which show the initial settings of the operation panel will also light up to indicate the 
ready condition. For the initial settings, see the "Initial settings of operation panel" 
described on the next page.
If you use the unit in a country other than the country where the unit was 
purchased, you will need to make sure that your local power supply is 
compatible with your model. If you plug the unit into an incompatible 
power supply, irreparable damage to the unit will result.
Only insert the power cord into a properly grounded wall socket.
Do not use extension cords or power strips.
The unit will enter a power save mode once the set time has elapsed 
without any unit operation. The settings of the power save modes can 
be modified. See "USER PROGRAMS" (p.53).
The unit will return to the initial settings a preset amount of time after 
the end of copy or scanner job. The preset amount of time (auto clear 
time) can be changed. See "USER PROGRAMS" (p.53).
Page of 7
Display

Click on the first or last page to see other AL-1217 (serv.man23) service manuals if exist.