PN-V602 (serv.man2). PNV Multi-Display Setup Notes - Sharp Monitor Handy Guide. Page 23

Read Sharp PN-V602 (serv.man2) Handy Guide online

CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
22
Tools for supporting installation (2)
Name (temporary)
Use
Image
Installation handle
(UKOG1005MPZZ)
 
For lifting the PN‐V601 up to a high location
This device is inserted into holes on top of PN‐V601 and 
 
enable lifting the PN‐V601 up to a high location during 
 
installation.
2 pieces of this device are necessary per one PN‐V601.
This installation handle is for improving efficiency of 
 
installation. Please use it if necessary.
Installation eyebolt device
(UKOG1006MPZZ)
 
For a crane to lift the PN‐V601 up to a high location.
This device is inserted into holes on top of PN‐V601 and 
 
enable lifting the PN‐V601 up by crane.
2 pieces of this device are necessary per one PN‐V601.
This installation eyebolt device is for improving the 
 
efficiency of installation. Please use it if necessary.
Interlocking pipe
(UKOG‐1007MPZZ)
‐For making it easy to install PN‐V601
It can reduce gap between the top‐to‐bottom of the PN‐V601 
 
and interlock each panel from both on the top and bottom of 
 
the PN‐V601 when installing with a stand etc. 
 
This pipe can 
 
prevent PN‐V601 from having excessive weight load from 
 
above and underneath. 
Please use this interlocking pipe for improving the accuracy 
 
when adjusting the vertical position of displays if necessary. It 
 
is not required for installation.
 
2 pieces of this pipe are 
 
necessary per one PN‐V601.
We will provide following service parts for installation (they are subject to fees)
* if you need above tools, please contact delivery agent or our sales reps.
Page of 27
Display

Click on the first or last page to see other PN-V602 (serv.man2) service manuals if exist.