Read Sharp PN-R903 Handy Guide online
Using elevator(carrying the display in vertical orientation with package) 4
Assembling procedure
4/10
【
Folding the case(1)】
- Prepare the case(1) and measure the
101
cm from side to folding point “c”.(overall view ④) - Crease and fold the same as case(2).
(overall view ⑤)
(
)
PN-R903 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
23
- Measure the
14
cm from side to
folding point “a” of the case(1).(overall view ④)
- Crease the folding point “a”
with your nail.(overall view ④)
with your nail.(overall view ④)
Click on the first or last page to see other PN-R903 service manuals if exist.