PN-L802B (serv.man2). Installation Guidelines (with Sharp stand) - Sharp Monitor Handy Guide. Page 17

Read Sharp PN-L802B (serv.man2) Handy Guide online

PN-L802B Installation Guidelines <Rev1.0> February 2012 
CONFIDENTIAL 
   
The space to carry in 
16 
Precautions for handling package of floor stand/carrying after construction 2 
1. The space to carry in 
  Please carry the main body with wheeled platform to the installation place. 
  The following space is necessary to pass through with wheeled platform  
   (wheeled platform size : Width : 300mm or less, height : 150mm or less) 
  
Carrying after construction doesn’t need wheeled platform. 
 
The main body 
wall 
ceiling 
   
Width 
Height 
Package 
500mm or more 
1,250mm or more 
After construction 
1,050mm  
or more 
1,850mm or more 
(without display 
2,150mm or more 
(with display 
   
Space 
Package 
*
 
1,200mm or more 
After construction 
1,750mm or more 
Package : 1,200mm 
After construction : 1,750mm 
Package : 1,200mm 
After construction : 1,750mm 
Package : 1,250mm 
Package : 500mm 
After construction : 1,050mm 
After construction : 1,850mm(without display) 
                               2,150mm(with display) 
wall 
wall 
Wheeled platform 
wall 
wall 
wall 
•Assumption of temporary  
  portrait orientation for    
  transportation. 
  Please keep properly position  
  
when it’s carried by truck or   
  stored for long period. 
2.   The space of the corner 
  When there is a corner on the carrying  course, 
   1,200mm/1,750mm or more width 
   (Package/after construction)  is necessary. 
  Caution : Please do not hit the side of package  
                   to the corner. 
 
Page of 21
Display

Click on the first or last page to see other PN-L802B (serv.man2) service manuals if exist.