R-671M - Sharp Home Appliance Service Manual (repair manual). Page 12

Read Sharp R-671M Service Manual online

R-671M  -  12
COMPONENT TEST
Initial temperature ..................................................................................................  T1 = 11
°
C
Temperature after (52 + 3) = 55 sec ......................................................................  T2 = 21
°
C
Temperature difference Cold-Warm ......................................................................
T1 = 10C
Measured output power
The equation is “P = 80 x 
T” ...................................................... P = 80 x 10
°
C = 800 Watts
JUDGMENT: The measured output power should be at least 
±
 15 % of the rated output power.
CAUTION: 1
°
C CORRESPONDS TO 80 WATTS. REPEAT MEASUREMENT IF THE POWER IS
INSUFFICIENT.
1000g
1000g
1000g
T1˚C
T2˚C
Heat up for 55 sec
B
HIGH VOLTAGE  TRANSFORMER TEST
WARNING:
High voltage and large currents are present at the secondary winding and
filament winding of the high voltage transformer. It is very dangerous to work
near this part when the oven is on. NEVER make any voltage measurements
of the high-voltage circuits, including the magnetron filament.
C
HIGH VOLTAGE RECTIFIER ASSEMBLY TEST
CARRY OUT 3D CHECKS.
Isolate the high voltage rectifier assembly from the HV circuit. The high voltage rectifier  can be tested
using an ohmmeter set to its highest range. Connect the ohmmeter across the terminal B+C of the high
voltage rectifier and note the reading obtained. Reverse the meter leads and note this second reading.
The normal resistance is infinite in one direction and more than 100 k
 in the other direction.
CARRY OUT 4R CHECKS.
NOTE: FOR MEASUREMENT OF THE RESISTANCE OF THE RECTIFIER, THE BATTERIES OF
THE MEASURING INSTRUMENT MUST HAVE A VOLTAGE AT LEAST 6 VOLTS, BECAUSE
OTHERWISE AN INFINITE RESISTANCE MIGHT BE SHOWN IN BOTH DIRECTIONS.
CARRY OUT 3D CHECKS.
Disconnect the leads to the primary winding of the high voltage  transformer. Disconnect the filament
and secondary winding connections from the rest of the HV circuitry. Using an ohmmeter, set on a low
range,  it is possible to check the continuity of all three winding. The following readings should be
obtained:-
a. Primary winding ................................ approximately 2.6 
b. Secondary winding .......................... approximately 143 
c. Filament winding .........................................  less than 1 
If the readings obtained are not stated as above, then the high voltage transformer is probably faulty
and should be replaced.
CARRY OUT 4R CHECKS.
PROCEDURE
LETTER
TEST PROCEDURES 
CONT
...
Page of 43
Display

Click on the first or last page to see other R-671M service manuals if exist.