Read Sharp VENTA (serv.man11) Service Manual online
85
2. Phase 3 – Euro only
This is the Euro only phase.
It will be the same as the standard pound-based operation, with the exceptions detailed below.
These changes will be implemented by defining the relevant texts and values in the file
S98.TXT (user-defined texts)
It will be the same as the standard pound-based operation, with the exceptions detailed below.
These changes will be implemented by defining the relevant texts and values in the file
S98.TXT (user-defined texts)
2.1 Currency character and texts
The RINCS variables CURCHAR and CURDSP (from Phase 2) will define the displayed and
printed symbols. Cheque text and price entry units will need modification (as in Phase 2)
printed symbols. Cheque text and price entry units will need modification (as in Phase 2)
2.2 Cash declaration
Cash declaration entry and the CCD report must be adapted for Euro notes and coinage.
Click on the first or last page to see other VENTA (serv.man11) service manuals if exist.