Read Sharp UP-5900 (serv.man7) Service Manual online
UP-5900VI
Built-in printer: UP-T80BP
– 14 –
14) Wiring for each cables as shown below.
a) Attach the FERRITE CORE (S size)
Y
to the I/F CABLE
8
.
b) Fix the I/F CABLE
8
and EARTH WIRE
[
with the CABLE BAND
Z
.
c) Set the switch: SW2 to the “MRS” position.
Fig. 9
15) Install the BOTTOM PLATE
2
.
Fig. 10
16) Install the PRINTER COVER
Y
.
Fig. 11
26
SW2
22
13
21
16
19
27
28
8
29
31
30
1
2
29
Click on the first or last page to see other UP-5900 (serv.man7) service manuals if exist.