Read Sharp UP-5300 (serv.man4) Service Manual online
4) Install the FDD ANGLE-A
8
.
a) Install the two FDD ANGLE-A
8
and EARTH WIRE
F
to the
FDD UNIT
G
with the four screws
H
.
5) Connect the FDD CABLE
I
to the FDD UNIT
G
.
6) Install the ferrite core
M
onto the FDD cable
I
.
7) Install the FDD UNIT
G
to the UP-5300.
a) Install the FDD UNIT
G
and FDD ANGLE-B
J
to the bottom
cabinet with the four screws
K
.
b) Connect the FDD CABLE
I
to the Main PWB.
c) Pass the EARTH WIRE
F
through the hole
A
.
d) Install the EARTH WIRE
F
with the screw
L
.
5
4
7
2
1
1 2
8
1 0
1 3
1 1
8
1 2
1 7
15
11
14
13
10
15
16
10
A
17
UP-5300VI
– 18 –
Click on the first or last page to see other UP-5300 (serv.man4) service manuals if exist.