UP-3500 (serv.man32). UP3500 (V2) In-Line User Manual - Sharp EPOS User Guide / Operation Manual. Page 53

Read Sharp UP-3500 (serv.man32) User Guide / Operation Manual online

52
When the master or back-up master recovers from a breakdown, the recovery declaration operation should
be taken to inform satellites of the recovery.
(1) When the master recovers from a breakdown – Recovery declaration
at the back-up master
Flow of a recovery declaration at the back-up master
1) The recovery declaration operation is done at the back-up master.
2) Each satellite stops sending updated GLU data (and clerk data*) to the back-up master
temporarily.
3) The back-up master sends the updated GLU data (and clerk data*) files to the master.
4) The back-up master informs all satellites of the master's recovery.
5) The satellites restart sending updated GLU data (and clerk data*) to the master and the IRC
system returns to the normal state.
*Only for the centralized clerk file system
The recovery declaration procedure is as follows:
1. 
Enter the PGM2 mode from the mode selection window.
2. 
Select “7 DECLARE & RECOVERY MA/BMA” from the displayed menu.
The DECLARE & RECOVERY MA/BMA window will appear.
3. 
Select “2 SYNCHRONIZE DB MA/BMA.”
3) Updated data file
Satellite
4) Master
     recovery
     information
2) Transmission stops temporarily.
Recovery declaration
 1) Recovery
      declaration
      operation
Back-up master
Master
5) Restart of updated
     data transmission  
3. Recovery declaration
Page of 59
Display

Click on the first or last page to see other UP-3500 (serv.man32) service manuals if exist.