UP-3301 (serv.man7). Installation Manual (Version A Only) - Sharp EPOS Service Manual (repair manual). Page 10

Read Sharp UP-3301 (serv.man7) Service Manual online

UP-3301VI
Built-in Printer: UP-T80BP
– 8 –
10) Fastening onthe table: Secure the Base cabinet 
2
 using the screw.
Lowering the height of the UP-P16DP
Remove the standard pole and attach the base cabinet 
4
 to the ratchet
9
.
18. Built-in Printer: UP-T80BP
1. UP-T80BP INSTALLATION
1. Remove the BOTTOM PLATE 
2
2
2
2
.
1) Remove the three SCREWs 
1
.
2) Remove the BOTTOM PLATE 
2
.
3) Remove the SCREW 
3
, CABLE CLAMP 
4
 and POWER SUPPLY
CABLE 
5
.
Fig. 1
No.
NAME
USE
Q’ty
I
Screw (M4 x 16)
Securing the UP-P16DP to 
the wooden table
4
J
Screw (M4 x 20)
Securing the UP-P16DP to 
the metal table
4
K
Nut
Securing the UP-P16DP to 
the metal table
4
13
13
14
14
15
15
2
1
3
4
5
Page of 15
Display

Click on the first or last page to see other UP-3301 (serv.man7) service manuals if exist.