RZ-X750 (serv.man4). RZ-X750 Service Manual - Sharp EPOS Service Manual (repair manual). Page 28

Read Sharp RZ-X750 (serv.man4) Service Manual online

26
In case a VESA stand shall be mounted instead of the standard stand, proper heat 
absorption from the main board must be ensured. Failure to have proper heat 
dissipation may result in unit overheating and possible system shutdown. Because the 
mounting plate of the VESA stand could be the wrong shape, there may not be 
sufficient contact to the heat sink of the main board. Therefore it is absolutely necessary 
to mount the VESA stand over the LCD bracket, but NOT directly to the main unit. The 
LCD bracket can be removed from the standard stand by removal of 4 screws, then 
remounted to the unit. Please see below picture.
The screw length depends on the thickness of the VESA stand plate combined with the 
LCD bracket. Insure that the end of the screw which will be turned into the main unit is 
not longer than 7mm. (NOTE: black screws should be used instead of silver ones. This is 
only an example for visibility.)
VESA stand
 LCD bracket 
Max, 7mm length
Heat sink of main board 
Heat sink of LCD bracket 
LCD bracket
RZ-X750 VESA MOUNTING
RZ-X750 VESA MOUNTING 
Due to the fanless design of the RZ-X750, it is important to have the LCD bracket properly 
mounted to the main unit. In this design the heat sink at the LCD bracket touches the heat 
sink of the main board and the LCD bracket is used for heat dissipation. Please see below 
picture which shows the LCD bracket disassembled from the main unit: