DOS HOSPITALITY (serv.man48). UP5700-004 Changes to the Main and CPU PWB - Sharp EPOS Technical Bulletin (repair manual)

dos hospitality (serv.man48) technical bulletin
Model
DOS HOSPITALITY (serv.man48)
Pages
11
Size
535.36 KB
Type
PDF
Document
Technical Bulletin
Brand
Device
EPOS / UP5700-004 Changes to the Main and CPU PWB
File
dos-hospitality-sm48.pdf
Date

Read Sharp DOS HOSPITALITY (serv.man48) Technical Bulletin online

CHANGES CARRIED OUT IN MODEL UP-5700.
1.
CHANGE CARRIED OUT IN THE MAIN PWB.
2-1. DISCONTINUANCE OF THE CPU TEMPERATURE DETECTING CIRCUIT.
2-2. CHANGE CARRIED OUT IN THE CPU PWB (2).
2-3. CHANGE CARRIED OUT IN THE CPU PWB (3).
2-4. CHANGE CARRIED OUT IN THE CPU PWB (4).
 1. Change carried out in the main PWB. 
1.Model Name:
UP-5700
2.General:
A change has been carried out on the main PWB.  This action has been carried out as
a measure to establish uniformity of the main PWB between model UP-5700 and model
BE-8500.
3.Description:
A change has been carried out on the main PWB. The main PWB version has been
changed from X7537BH-81 to X7537BH-84. Details of the content of the change are as
follows.
<1> A pull-up resistor R256 (10 K
) has been added to the PWB pattern at the DSR8# 
signal (pin IC10-40).
<2> A pull-up resistor R257 (10 K
) has been added to the PWB pattern at the SHEN2# 
signal (pin IC10-65).
<3> A pull-down resistor R258 (10 K
) has been added to the PWB pattern at the STH2 
signal (pin IC10-68).
These resistors have not been packaged.
4.Action:
For production: Running change carried out from 1998 July production.
(Interchangeability): Old parts are interchangeable with new parts for model UP-5700.
5.Other:
Attached supplementary documents: Circuit diagram, Figure 1.
1/11
ELECTRONIC CASH REGISTER
TECHNICAL BULLETIN
Date :
Model :
Ref :
Colour
Code :
11th January 1999
UP5700
UP5700-004
White
Sharp Electronics (UK) Ltd, Technical Support Group
Originators Initials_____________ Supervisors Initials_____________ Approval Date____________
 2-1. Discontinuance of the CPU temperature detecting circuit (1). 
1.Model Name:
UP-5700
2.General:
The redundant CPU temperature detecting circuit of the CPU PWB has been
discontinued.
3.Description:
Changed parts:
Ref. No.
Parts Code
Description
C2
VCKYTV1HB103K
Discontinued
C3
VCKYTV1HB103K
C4
VCKYTV1HF104Z
IC5
VHIKIA555F/-1
IC6
VHILM334S8/-1
R17
VRS-TS2AD202J
R18
VRS-TS2AD221J
There is no problem whether or not the parts listed above are packaged or not.
4.Action:
For production: From March 1998 production.
5.Other:
Attached supplementary documents: Circuit diagrams of the changed section.
 2-2. Change carried out in the CPU PWB (2). 
1.Model Name:
UP-5700
2.General:
An OS capacitor has been packaged in the 2.9 V power supply line of the CPU PWB. 
In accordance with this, the redundant OS capacitor on the main PWB side has been
discontinued.
3.Description:
C18 (RC-EZ1572RC01) of the main PWB has been discontinued.
4.Action:
For field: No field action is necessary.
For production: From December 1997 production.
5.Other:
Attached supplementary documents: Circuit diagrams of the changed section, Figure 3.
2/11
 2-3. Change carried out in the CPU PWB (3). 
1.Model Name:
UP-5700
2.General:
A change has been carried out in the CPU PWB. This action has been carried out as a
measure to improve productivity concerning the finishing operations on the added
capacitor.
3.Description:
A change has been carried out in the CPU PWB. The PWB version has been changed
from X7550BH-70 to X7550BH-83. Details of the content of the change are as follows.
<1> C59: 150 
µ
F / 6.3 V
Added PWB pattern
<2> C60: 1000 pF
Added PWB pattern
4.Action:
For production: Running change from March 1998 production.
5.Other:
Attached supplementary documents: PWB silk screening of the changed section,
Figure 4.
 2-4. Change carried out in the CPU PWB (4). 
1.Model Name:
UP-5700
2.General:
A change has been carried out in the pattern of the CPU PWB. This action has been
carried out as a measure to improve productivity of the finishing operations on the
added jumper wire.
3.Description:
A change has been carried out in the CPU PWB. The PWB version has been changed
from X7550BH-83 to X7550BH-84. The finishing operations on the added jumper wire
have been discontinued.
4.Action:
For production:
<1> UP-5700 : Running change carried out from August 1998 production.
5.Other:
Attached supplementary documents: PWB pattern of the changed section, Figure 5.
3/11
4/11
Fig. 1
Page of 11
Display

Download Sharp DOS HOSPITALITY (serv.man48) Technical Bulletin

Here you can read online and download Sharp DOS HOSPITALITY (serv.man48) Technical Bulletin in PDF. DOS HOSPITALITY (serv.man48) technical bulletin will guide through the process and help you recover, restore, fix, disassemble and repair Sharp DOS HOSPITALITY (serv.man48) EPOS. Information contained in service manuals typically includes schematics / circuit diagrams, wiring diagrams, block diagrams, printed wiring boards, exploded views, parts list, disassembly / assembly, pcb.