UP-600, UP-700 (serv.man22). UP600-700 Option Installation Manual - Sharp ECR Service Manual (repair manual). Page 6

Read Sharp UP-600 / UP-700 (serv.man22) Service Manual online

CHAPTER 7. IN-LINE I/F : UP-E10IN
1) Remove the top cabinet.
2) Install the spacer 
 on the MAIN PWB 
 .
3) Connect the UP-E10IN 
 to the MAIN PWB 
 (CN:     ).
4) Fix the UP-E10IN 
 to the spacer 
 with a screw 
.
5) Pass the TCP/IP cable 
 through the two standard holder 
and one core 
 to the following PWB.
UP-E10IN side 
: CN3, MCR POLE RELAY PWB side 
  :
CN504
7) Remove the rear cover.
8) Connect the LAN cable 
 to the LAN connector 
.
9) Install the core 
 to the LAN cable 
CHAPTER 8. MCR UNIT : UP-E13MR
1) Align the MCR sheet 
 with the positioning line of the top
cabinet 
.
2) Mark 3 points of the asterisk mark on the MCR sheet 
.
3) Aligning with the markings, secure the MCR angle 1 
 to the
top cabinet 
 with 3 screws 
.
4) Install the MCR unit 
 to the MCR angle 1 
 and secure with
2 screws 
.
1
2
3
4
5
8
8
9
7
6
10
11
12
2
2
1
3
4
4
6
5
Page of 11
Display

Click on the first or last page to see other UP-600 / UP-700 (serv.man22) service manuals if exist.