DV-NC65H (serv.man13). Adjustment, replacement and assembly of mechanical units - Sharp DVD Service Manual (repair manual). Page 20

Read Sharp DV-NC65H (serv.man13) Service Manual online

39
DV-NC65H/S
DV-NC70H
Figure 8-38.
Loading arm (T)
Sifter
Insert point
Loading arm (T)
Loading arm (S)
Phase matching
*Not run on the 
sifter.
Sifter
Tension arm
a
c
b
8-24. INSTALLING THE SIFTER
Figure 8-37.
Drum
Capstan D.D.
motor
(Bottom side of mechanism chassis)
* Remove the SUP/TU main brake before installation.
1. Make sure that the loading arm T and S are at the Phase-
Matching point as shown below     .
2. Fix the sifter position setting part to the roading arm T
position setting part as shown in figure     .
3. Make sure tension arm not run on the sifter as shown in
figure     .
a
b
c
Page of 23
Display

Click on the first or last page to see other DV-NC65H (serv.man13) service manuals if exist.