Read Sharp XL-UR230H (serv.man2) Service Manual online
ASSEMBLY SEQUENCE
1. FIX ITEM 2 3 4 5 TO ITEM 1
THAN SOLDER
1
CAUTION
1. MAKE SURE SWITCH & CONNECTOR NO FLOATING
1
2
AFTER SOLDER
2
2. MAKE SURE SWITCH BOSS INSERT INSIDE HOLE
2
SWITCH SLANTING N.G.
SOLDER TEMP
2
330 ~ 350
2
2
CANNOT PUSH THIS PORTION
OF SWITCH BY HAND DURING HANDLING
2
4
1
3
5
DO NOT PRESS SW ON
TOP SURFACE
TOP SURFACE
2
2
2
VERY IMPORTANT
NO GAP
1
HAVE GAP OR SLANTING
BEFORE FIX THE PWB TO
2
CHANGER MUST CONFIRM
SW LEVER MOVE FREELY &
MUST FREE FROM FLUX
SW LEVER MOVE FREELY &
MUST FREE FROM FLUX
* MUST NOT BE FLOATING. MUST SIT FLAT
O.K
N.G
N.G
O.K
N.G
O.K
PUSHING OF SW IN EITHER
DIRECTION AS SHOWN ABOVE
IS NOT ALLOWED
DIRECTION AS SHOWN ABOVE
IS NOT ALLOWED
Click on the first or last page to see other XL-UR230H (serv.man2) service manuals if exist.