CD-BA3100 (serv.man4). Split - Section 2b - Alternative CD changer mechanical breakdown - Sharp Audio Service Manual (repair manual). Page 5

Read Sharp CD-BA3100 (serv.man4) Service Manual online

CD-BA3100
– 20 –
43
44
41
33
32
47
46
28
10
Mark position
11
45
42
LIFT GEAR A
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F
35
TRAY JOINT GEAR F
02
CHANGE BOX L
*1
30
TRAY DRIVE GEAR F
40
LIFT CAM
40
LIFT CAM
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F
37
°
*2
TRAY JOINT GEAR F
(CHANGE BOX L ASS'Y) ASSEMBLING POSITION
LIFT CAM
Direct the recess part (trapezoidal side) 
of the axis 35 in this direction.
Assembling procedure
1. Turn the mode big gear approx. 37 degrees in the arrow direction.
2. Assemble the change box L ass'y.
Note: At this time, the tray joint gear F must be located in the position shown in figure.
Moreover, the gear must be engaged securely.
3. After assembly, return the mode big gear to the initial position.
4. Assemble the lift cam.
Note: At this time, the lift cam (No.40) must be located in the position shown in figure 20.
Scale: 2 magnifications
*1: To position the axis part 
      of 35, engage it with 33.
*2: When it is aligned as 
      described in *1, the hatched part 
      (low gear-height part of gear) 
      will be positioned as shown.
Since this gear engagement is not 
visually checked, verify that it does 
not float when the gear box L is installed.
Scale: 2 magnifications
During assembly, make the 
O part visible in this direction.
Note: Among 4 ribs on the 
         circumference, one rib alone 
         is provided with O.
Figure 20
Page of 7
Display

Click on the first or last page to see other CD-BA3100 (serv.man4) service manuals if exist.