CD-BA3100 (serv.man3). Split - Section 2a - Alternative CD changer mechanical breakdown - 18-24 - Sharp Audio Service Manual (repair manual). Page 5

Read Sharp CD-BA3100 (serv.man3) Service Manual online

CD-BA3100H
– 22 –
Mark position
37
°
33
32
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F
02
CHANGE BOX L
< Importance >
Direct the recess part
(trapezoidal side) of the
 axis 35 in this direction.
*2
*1: To position the axis part 
      of 35, engage it with 33.
*2: When it is aligned as 
      described in *1, the hatched part 
      (low gear-height part of gear) 
      will be positioned as shown.
Since this gear engagement is not 
visually checked, verify that it does 
not float when the gear box L is installed.
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F
*1
43
41
40
LIFT
CAM
Scale: 2 magnifications
44
11
TRAY JOINT GEAR F
(CHANGE BOX L ASS'Y) ASSEMBLING POSITION
LIFT CAM
Assembling procedure
1. Turn the mode big gear approx. 37 degrees in the arrow direction.
2. Assemble the change box L ass'y.
Note: At this time, the tray joint gear F must be located in the position shown in figure.
          Moreover, the gear must be engaged securely.
3. After assembly, return the mode big gear to the initial position.
4. Assemble the lift cam.
Note: At this time, the lift cam (No.40) must be located in the position shown in figure 22.
47
46
10
45
42
LIFT GEAR A
28
L
40
LIFT CAM
Scale: 2 magnifications
During assembly, make the 
O part visible in this direction.
Note: Among 4 ribs on the 
          circumference, one rib alone 
          is provided with O.
< Importance >
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F
Figure 22
Page of 7
Display

Click on the first or last page to see other CD-BA3100 (serv.man3) service manuals if exist.