Read Sharp AH-X108 Service Manual online
AH/AU-X108E
AY/AE-X108E
AH/AU-X138E
AY/AE-X138E
44
21. Take the compressor cover out.
[Reactor box] AU-X138E AND AE-X138E ONLY
22. Remove one screw which is fixing the reactor box.
22. Remove one screw which is fixing the reactor box.
23. Remove four screws which are fixing the reactor box
cover. And take it out.
24. Disconnect two terminals and one earth wires.
25. Remove four screws which are fixing the reactor.
[Fan motor angle]
26. Remove two screws which are fixing the fan motor
26. Remove two screws which are fixing the fan motor
angle. And take it out.
Click on the first or last page to see other AH-X108 service manuals if exist.