Z8, Chassis - Panasonic TV Other Service Manuals (repair manual). Page 10

Read Panasonic Z8 / Chassis Other Service Manuals online

3DQDVRQLF
3.4.
Start Up
A start-up circuit is used to start and stop the
operations of the control IC IC801 (STR-F6523), by
detecting the voltage appearing at the V
IN
terminal,
pin 4.
At start-up, capacitor C810 is charged via R804,
which causes the voltage at pin 4 of IC801 to
increase. Once V
IN
terminal pin 4 voltage reaches
approximately 16V, IC801 begins to operate and drive
the internal power MOSFET, causing current to flow
through the drain/source terminals at pins 3 and 2,
and to the winding B1-B2 of switching transformer
T802 via L803 and R809. The current at terminal B1
is split into two paths.
The first path follows the current being fed to the
winding B1-B2 and back to pin 4 of IC801 via R811
and D805. Once the control circuit starts operation,
the voltage at the V
IN
terminal pin 4 of IC801 starts to
decrease. However, the drive winding voltage
reaches the set value before pin 4 voltage drops to the
shutdown voltage of 10V. Hence the voltage supply to
pin 4 is maintained.
The second path is connected from terminal B1 to P2
of the FBT. This causes current to flow via the winding
P2-P1, which provides the +B supply to the FBT T552
pin 9.
$&
LQ
$&
LQ
Page of 47
Display

Click on the first or last page to see other Z8 / Chassis service manuals if exist.