KX-TG6711RUB, KX-TG6711RUM, KX-TG6712RUM, KX-TG6721RUB, KX-TG6721RUS, KX-TG6722RUB, KX-TG6711CAB, KX-TG6711CAM, KX-TG6721CAB, KX-TG6721CAM, KX-TG6722CAB, KX-TG6711UAB, KX-TG6711UAM, KX-TG6712UAB, KX-TG6721UAB, KX-TGA671RUB, KX-TGA671RUS - Panasonic Telephone Service Manual (repair manual). Page 45

Read Panasonic KX-TG6711RUB / KX-TG6711RUM / KX-TG6712RUM / KX-TG6721RUB / KX-TG6721RUS / KX-TG6722RUB / KX-TG6711CAB / KX-TG6711CAM / KX-TG6721CAB / KX-TG6721CAM / KX-TG6722CAB / KX-TG6711UAB / KX-TG6711UAM / KX-TG6712UAB / KX-TG6721UAB / KX-TGA671RUB / KX-TGA671RUS Service Manual online

45
KX-TG6711RU/KX-TG6712RU/KX-TG6721RU/KX-TG6722RU/KX-TG6711CA/KX-TG6712CA/KX-TG6721CA/KX-TG6722CA/KX-TG6711UA/KX-TG6712UA/KX-TG672IUA//KX-TGA671EX
(N)
Audio Check and 
Confirmation
-
1. Link to BASE which is connected to Line Simulator.
2. Set line voltage to 48 V and line current to 50 mA.
3. Input -45 dBm (600 
Ω)/1 kHz to MIC of Handset. Measure the Level at Line I/F
and distortion level.
4. Confirm that the level is -1 dBm ± 5 dB and that the distortion level is < 5 %    at
TEL Line (600 
Ω Load).
5. Input -20 dBm (600 
Ω)/1 kHz to Line I/F. Measure the Level at Receiver of
Handset and distortion level (Receive volume set to second position from
minimum).
6. Confirm that the level is -24 dBm ± 4 dB and that the distortion level is < 5 % at
Receiver (34 
Ω Load).
IC1, C12, C96, 
C97, R5, R27, 
RA4, C11, 
C13, R28, MIC
(O) SP phone Audio Check 
and Confirmation
-
1. Link to Base which is connected to Line Simulator.
2. Set line voltage to 48 V and line current to 50 mA.
3. Set the handset off-hook using SP-Phone key.
4. Input -30 dBm (600 
Ω)/1 KHz to Line I/F and measure Receiving level at SP+
and SP-.
5. Confirm that the level is -8 dBm and that the distortion level is < 5 %. 
(vol = Max at SP (8 
Ω Load))
IC1, C12, C73, 
D13, D14, 
MIC, C11, 
C13, RA4, 
R27, R28, 
C96, C97, R5, 
C72, C73
(P)
Charge Pump 3.0 V 
Supply Confirmation
CP3V
1. Confirm that the voltage between testpoint CP3.0V and GND is 3.0 V ± 0.3 V. C30, C53, C54
(Q) Charge Pump CP_LED 
3.0V Supply 
Confirmation
CP_LED
1. Confirm that the voltage between testpoint CP_LED and GND is 3.0 V ± 0.3 V.
(Power is supplied when LED in on)
C52, C55 
(R)
Charge Pump CP2.8V
Supply Confirmation
CP2.8V
1. Confirm that the voltage between testpoint CPV2.8V and GND is 2.8V ± 0.3 V.
C30, C53, 
C54, D3, C51 
Items
Check 
Point
Procedure
Check or 
Replace Parts
Page of 102
Display

Click on the first or last page to see other KX-TG6711RUB / KX-TG6711RUM / KX-TG6712RUM / KX-TG6721RUB / KX-TG6721RUS / KX-TG6722RUB / KX-TG6711CAB / KX-TG6711CAM / KX-TG6721CAB / KX-TG6721CAM / KX-TG6722CAB / KX-TG6711UAB / KX-TG6711UAM / KX-TG6712UAB / KX-TG6721UAB / KX-TGA671RUB / KX-TGA671RUS service manuals if exist.