Read Panasonic PT-RZ370U / PT-RZ370E / PT-RZ370EA / PT-RW330U / PT-RW330E / PT-RW330EA (serv.man4) Service Manual online
DIS-8
6. Remove 5 screws (5 x ordinal +type silver tap screws) then remove the optical block.
* Disconnect the flex cable on D-PCB from the laser unit, then proceed the removal step of optical block.
* Lift the optical block a little, then disconnect 2 cables on D-PCB from LED unit.
7. Remove 3 screws (ordinal + type silver screws with washers) then remove the lens unit from the DMD block.
* Please watch carefully not to loose the SIM spacers between lens unit and DMD block.
8. Remove 3 screws (3mm hex screws) then separate the DMD block from the lighting block.
DMD block
Lighting block
XVE4A10FT (3mm hex screw)
100±20
N・cm
XYN3+F20FJ
Lens unit
70±10
N・cm
<Optical block>
105±15
N・cm
Optical block
* Peel off the aluminum tape at the position of screw hole.
XTB4+12GFJ
[ CAUTION ]
Unplug the Flex cable before
remove the optical block.
remove the optical block.
Click on the first or last page to see other PT-RZ370U / PT-RZ370E / PT-RZ370EA / PT-RW330U / PT-RW330E / PT-RW330EA (serv.man4) service manuals if exist.