PT-RQ13K (serv.man2) - Panasonic Projector Service Manual (repair manual). Page 99

Read Panasonic PT-RQ13K (serv.man2) Service Manual online

ADJ-11
SECTION 3 ADJUSTMENTS
< RQ13K >
1. 6. Clog sensor calibration
[Note]]
  •  Projector should be completely assembled and the adjustable feet are com-
pletely accommodated in the body.
  •  Place the projector on the floor and replace the air filter with a new one.
  •  Calibration at a location where there are no heat apparatus and supply open-
ing of the air-conditioner.
1.  Enter the service mode, and select submenu [CLOG SENSOR CALIBRATION] 
of [EXTRA OPTION] menu.
2. Select the [OK], and press [ENTER] button to start the calibration
  •  When the calibration is started, the screen becomes whole magenta.
  •  Do not shut down the power of projector during the calibration.
  •  The progress is shown at the left top portion of the display with % unit.
3.  After approx 15 minutes, when the magenta screen disappear and return to 
the normal screen, calibration is completed.
4. Restart the main power of projector and check that it operates properly.
1. 7. Date and time setup
1. Select the [DATE AND TIME] of [PROJECTOR SETUP] menu.
2. Set the time zone, date, and time of the built-in clock of the projector.
  • For further instructions, refer to the operating instructions.
DATE AND TIME
TIME ZONE
ADJUST CLOCK
LOCAL DATE
LOCAL TIME
+09:00
2013/01/01
13:15:36
30 %
EXTRA OPTION
DYNAMIC GAMMA MODE
3DCMS
SELF CHECK
POWER OFF MESSAGE
ERROR OSD
ELECTRICAL COVERGENCE
MECHANICAL CONVERGENCE
MODEL
CLOG SENSOR CALIBRATION
SMOKE FILTER DISPLAY
LIGHT SELECT
SHUTTER KEEP
ALL
ON
ON
ON
OFF
CLOG SENSOR CALIBRATION
Page of 127
Display

Click on the first or last page to see other PT-RQ13K (serv.man2) service manuals if exist.