PT-DZ570U, PT-DZ570E, PT-DW530U, PT-DW530E, PT-DX500U, PT-DX500E (serv.man8) - Panasonic Projector Service Manual (repair manual). Page 53

Read Panasonic PT-DZ570U / PT-DZ570E / PT-DW530U / PT-DW530E / PT-DX500U / PT-DX500E (serv.man8) Service Manual online

<PT-DZ570U/PT-DW530U/PT-DX500U/PT-DZ570E/PT-DW530E/PT-DX500E>
  1. 6. Clog Sensor Calibration
1. Setting to service mode and choose sub menu "CLOG SENSOR CALIBRATION" of main menu "EXTRA OPTION".
2. Choose the meters above the sea level of the work place and push the "ENTER" button.
3. When OK is selected and ENTER button is pressed, the calibration is executed.
4. After 15 minutes, the display returns to normal. This means the calibration is completed.
  Shut down the power and power up again. Then confirm the operation.
When the calibration starts, the display becomes all white.
Do not shut down the power of projector during the calibration.
The progress is shown at the left top portion of the display with % unit.
Clog sensor circuit is calibrated.
  Note: This operation should be done with the main body is completely assembled and set on the floor and
            the adjuster legs are set in the main body. Confirm that there is no heating equipments, flow out of
            air conditioner, obstacles for air intake and exausting. for the projector.
30 %
ADJ - 8
Page of 71
Display

Click on the first or last page to see other PT-DZ570U / PT-DZ570E / PT-DW530U / PT-DW530E / PT-DX500U / PT-DX500E (serv.man8) service manuals if exist.