7.5. PREPARATION
For hot air blowout time, refer to the following table. MODEL: SV-AS10
Removal
Installation
Preheat
Heat
Preheat
Heat
90 seconds
90 seconds
90 seconds
90 seconds
The temperatures are measured with DT-510 and DT-510A at a room temperature of approx. 20°C for reference.
Reflow tools
Preparation of tools
Setting conditions
Preheat
HEAT level
AIR level
SPOT HEATER
Install a nozzle to the blower
250°C
MIN
Turn on the power after presetting the
temperature and air flow.
Wait for at least 5 minutes to stabilize the hot
air temperature.
BOARD WARMER
Install the blower to the blower holder
180°C
----
NOTE:
Open the board warmer shutter beforehand.
Set the board warmer hood at the lowest
position.
12
SV-AV50EB / SV-AV50EG / SV-AV50GC / SV-AV50GK
Page of 40
Display

Click on the first or last page to see other SV-AV50EB / SV-AV50EG / SV-AV50GC / SV-AV50GK (serv.man3) service manuals if exist.