1.2. Leakage Current Cold Check ---------------------------3
1.3. Leakage Current Hot Check (See Figure 1.) --------3
1.4. How to Discharge the Capacitor on Flash Sub
2.4. How to Replace the Lithium Battery -------------------7
3.2. Important Notice --------------------------------------------8
3.3. General Description About Lead Free Solder
5 Location of Controls and Components------------------ 14
6 Service Mode ----------------------------------------------------- 34
8 Service Fixture & Tools --------------------------------------- 39
8.2. Clean Box -------------------------------------------------- 40
8.3. Service Position ------------------------------------------ 41
9.2. PCB Location---------------------------------------------- 42
9.3. Disassembly Procedure -------------------------------- 43
9.4. Disassembly and Assemble Procedure for the
which are important for safety. These parts are marked by
tial that these critical parts should be replaced with manu-
facturer’s specified parts to prevent X-RADIATION,
shock, fire, or other hazards. Do not modify the original
design without permission of manufacturer.
from the AC power line. Use a transformer of adequate
power rating as this protects the technician from acci-
dents resulting in personal injury from electrical shocks. It
will also protect AC Adaptor from being damaged by acci-
dental shorting that may occur during servicing.
heated or damaged by the short circuit.
properly installed.
shock hazards.
lic cabinet part on the equipment such as screwheads,
connectors, control shafts, etc. When the exposed metal-
lic part has a return path to the chassis, the reading
should be between 1 M
reading must be infinity.
(See Figure 1.)
and a good earth ground, as shown in Figure 1.
lent) may be used to make the hot checks, leakage cur-
rent must not exceed 1/2 mA. In case a measurement is
outside of the limits specified, there is a possibility of a
shock hazard, and the equipment should be repaired and
rechecked before it is returned to the customer.
2. Be careful of the high voltage circuit on FLASH SUB PCB when servicing.
2. Put the insulation tube onto the lead part of Resistor (ERG5SJ102:1k
4. After discharging confirm that the capacitor voltage is lower than 10V using a voltmeter.