Read Panasonic CS-C7DKD / CU-C7DKD / CS-C9DKD / CU-C9DKD / CS-C12DKD / CU-C12DKD Service Manual online
11.2.3. Re-air purging (Re-installation)
1. Confirm that both the 2-way and 3-way valves are set to
the closed position.
2. Connect the charge set and a charging cylinder to the
service port of the 3-way valve.
•
Leave the valve on the charging cylinder closed.
3. Air purging.
•
Open the valves on the charging cylinder and the
charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45° for 3 seconds then
closing it for 1 minute; repeat 3 times.
charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45° for 3 seconds then
closing it for 1 minute; repeat 3 times.
•
After purging the air, use a torque wrench to tighten the
flare nut on the 2-way valve.
flare nut on the 2-way valve.
4. Check for gas leakage.
•
Check the flare connections for gas leakage.
5. Discharge the refrigerant.
•
Close the valve on the charging cylinder and discharge
the refrigerant until the gauge indicates 3 to 5 kg/cm
the refrigerant until the gauge indicates 3 to 5 kg/cm
2
G
(0.3 to 0.5 MPa)
6. Disconnect the charge set and the charging cylinder,
and set the 2-way and 3-way valves to the open
position.
position.
•
Be sure to use a hexagonal wrench to operate the valve
stems.
stems.
7. Mount the valve stem nuts and the service port cap.
•
Be sure to use a torque wrench to tighten the service
port cap to a torque 1.8 kg.m (18 N.m).
port cap to a torque 1.8 kg.m (18 N.m).
•
Be sure to check for gas leakage.
Procedure:
58
CS-C7DKD CU-C7DKD / CS-C9DKD CU-C9DKD / CS-C12DKD CU-C12DKD
Click on the first or last page to see other CS-C7DKD / CU-C7DKD / CS-C9DKD / CU-C9DKD / CS-C12DKD / CU-C12DKD service manuals if exist.