CS-A28BKP5, CU-A28BKP5 - Panasonic Air Conditioner Service Manual (repair manual). Page 53

Read Panasonic CS-A28BKP5 / CU-A28BKP5 Service Manual online

11.2. Pumping down
 1. 
Confirm that both the 3-way valves are set to the open
position.
  • 
Remove the valve stem caps and confirm that the valve
stems are in the open position.
  • 
Be sure to use a hexagonal wrench to operate the valve
stems.
 2. 
Operate the unit for 10 to 15 minutes.
 3. 
Stop operation and wait for 3 minutes, then connect the
charge set to the service port of the 3-way valve.
  • 
Connect the charge hose with the push pin to the Gas
side service port.
 4. 
Air purging of the charge hose.
  • 
Open the low-pressure valve on the charge set slightly
to purge air from the charge hose.
 5. 
Set the Liquid side 3-way valve to the close position.
 6. 
Operate the air conditioner at the cooling cycle and
stop it when the gauge indicates 0 kg/cm
2
G (0 MPa).
  • 
If the unit cannot be operated at the cool condition
(weather is rather cool), press the Pump Down Switch
on the Indoor unit.
  • 
So that the unit can be operated.
 7. 
Immediately set the gas side 3-way valve to the close
position.
  • 
Do this quickly so that the gauge ends up indicating 1 to
3 kg/cm
2
G (0.1 MPa to 0.3 MPa).
 8. 
Use refrigerant reclaiming equipment to collect
refrigerant from indoor unit and pipes.
 9. 
Disconnect the charge set, and mount both the 3-way
valve
s stem nuts and the service port caps.
  • 
Use a torque wrench to tighten the service port cap to a
torque of 18 N.m.
  • 
Be sure to check for gas leakage.
 10. 
Disconnect pipes from indoor unit and outdoor unit.
Procedure:
53
CS-A28
BKP5
/CU-A28
BKP5
Page of 77
Display

Click on the first or last page to see other CS-A28BKP5 / CU-A28BKP5 service manuals if exist.