Read LG WT5075CW Service Manual online
5. COMPONENT TESTING INFORMATION
5-1. FILTER ASSEMBLY (LINE FILTER)
38
When resistance (Ohm) checking the component, be sure to turn the power off, and do
voltage discharge sufficiently.
voltage discharge sufficiently.
Wiring
diagram
diagram
Test
points
points
and
Result
Circuit in the MAIN PCB / Wiring Diagram
MAIN PCB
ASSEMBLY
ASSEMBLY
3 3
1 1
RD1
WH1
Vac
1 1
2 2
2 2
Test Points
WH (1) to RD (1)
WH (3) to RD (2)
Result
0
Ω
0
Ω
(1)
(3)
(1)
(2)
RD1
WH1
WARNING
Click on the first or last page to see other WT5075CW service manuals if exist.