60PS80BD-SA (CHASSIS:PB92A) - LG TV Service Manual (repair manual). Page 16

Read LG 60PS80BD-SA (CHASSIS:PB92A) Service Manual online

10-3. Check Items
(1) Test Voltage 
- GND: 1.5KV/min at 100mA
- Signal: 3KV/min at 100mA
(2) Test time: just 1 second.
(3) Test point
-  GND  test:  Test  between  Power  cord  GND  and  Signal
cable metal GND.
-  ESD  test:  Test  between  Power  cord  GND  and  Live  and
neutral.
(4) Leakage current: Set to 0.5mA(rms)
10-4. POWER PCB Assy Voltage Adjustment 
(Va, Vs voltage adjustment) <— ONLY PDP
(1) Profile
To supply the Va, Vs voltage that the module want.
(2) Equipment :
Stick for adjustment, DMM
(3) 42Inch/50Inch Adjustment method for Power board
- After Changing RF snow noise.
1) Connection Diagram for measuring
2) Vs Adjustment 
Connect  +  terminal  of  D.  M..M.  to  Vs  pin  of  P811,
connect - terminal to GND pin of P811.
After  turning  VR901,  voltage  of  D.M.M  adjustment  as
same as Vs voltage which on label of panel right/top  (
deviation ; ±0.5V)
(4) 50FHD Adjustment method for Power board
- After Changing RF snow noise.
1) Connection Diagram for measuring
2) Va Adjustment 
Connect  +  terminal  of  D.  M..M.  to  Va  pin  of  P811,
connect - terminal to GND pin of P811.
After  turning  VR501,  voltage  of  D.M.M  adjustment  as
same as Va voltage which on label of panel right/top  (
deviation ; ±0.5V)
3) Vs Adjustment 
Connect  +  terminal  of  D.  M..M.  to  Vs  pin  of  P811,
connect - terminal to GND pin of P811.
After  turning  VR901,  voltage  of  D.M.M  adjustment  as
same as Vs voltage which on label of panel right/top  (
deviation ; ±0.5V)
(5) 60FHD Adjustment method for Power board
- After Changing RF snow noise.
1) Connection Diagram for measuring
2) Va Adjustment 
Connect  +  terminal  of  D.  M..M.  to  Va  pin  of  P812,
connect - terminal to GND pin of P812.
After  turning  VR901,  voltage  of  D.M.M  adjustment  as
same as Va voltage which on label of panel right/top  (
deviation ; ±0.5V)
3) Vs Adjustment 
Connect  +  terminal  of  D.  M..M.  to  Vs  pin  of  P812,
connect - terminal to GND pin of P812.
After  turning  VR951,  voltage  of  D.M.M  adjustment  as
same as Vs voltage which on label of panel right/top  (
deviation ; ±0.5V)
- 16 -
Connection Diagram of power adjustment for measuring.
Connection Diagram of power adjustment for measuring.
Connection Diagram of power adjustment for measuring.
Page of 62
Display

Click on the first or last page to see other 60PS80BD-SA (CHASSIS:PB92A) service manuals if exist.