55LE5400 (CHASSIS:LA02D) - LG TV Service Manual (repair manual). Page 16

Read LG 55LE5400 (CHASSIS:LA02D) Service Manual online

- 16 -
6. GND and Hi-pot Test 
6.1. Method
6.1.1. GND & HI-POT auto-check preparation  
(1) Check the POWER CABLE and SIGNAL CABE
insertion condition 
6.1.2. GND & HI-POT auto-check  
(1) Pallet moves in the station. (POWER CORD / AV
CORD is tightly inserted) 
(2) Connect the AV JACK Tester. 
(3) Controller (GWS103-4) on. 
(4) GND Test (Auto)  
- If Test is failed, Buzzer operates. 
- If Test is passed, execute next process (Hi-pot test).
(Remove A/V CORD from A/V JACK BOX)  
(5) HI-POT test (Auto) 
- If Test is failed, Buzzer operates. 
- If Test is passed, GOOD Lamp on and move to next
process automatically. 
6.2. Checkpoint
• TEST voltage
- GND: 1.5KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
• TEST time: 1 second
• TEST POINT
- GND TEST = POWER CORD GND & SIGNAL CABLE
METAL GND
NEUTRAL
• LEAKAGE CURRENT: At 0.5mArms
Page of 85
Display

Click on the first or last page to see other 55LE5400 (CHASSIS:LA02D) service manuals if exist.