55EA9800-CA (CHASSIS:EC34D) - LG TV Service Manual (repair manual). Page 13

Read LG 55EA9800-CA (CHASSIS:EC34D) Service Manual online

- 13 -
ADJUSTMENT INSTRUCTION
1. Application Range
This specification sheet is applied to EC34D Chassis applied 
OLED TV all models manufactured in TV factory.
2. Designation
(1)  Because  this  is  not  a  hot  chassis,  it  is  not  necessary  to 
use an isolation transformer. However, the use of isolation 
transformer will help protect test instrument.
(2) Adjustment must be done in the correct order. 
(3)  The adjustment must be performed in the circumstance of 
25 °C ± 5 °C of temperature and 65 % ± 10 % of relative 
humidity if there is no specific designation. 
(4)  The  input  voltage  of  the  receiver  must  keep AC  100-240 
V~, 50/60 Hz.
(5)  The receiver must be operated for about 5 minutes prior to 
the adjustment when module is in the circumstance of over 
15 °C.
In case of keeping module is in the circumstance of 0 °C, it 
should be placed in the circumstance of above 15 °C for 2 
hours.
In case of keeping module is in the circumstance of below 
-20 °C, it should be placed in the circumstance of above 15 
°C for 3 hours.
[Caution] 
When  still  image  is  displayed  for  a  period  of  20  minutes  or 
longer  (Especially  where  W/B  scale  is  strong.  Digital  pattern 
13ch  and/or  Cross  hatch  pattern  09ch),  there  can  some 
afterimage in the black level area.
3. MAIN PCBA Adjustments
3.1. ADC Calibration
-  An ADC  calibration  is  not  necessary  because  MAIN  SoC 
(LGExxxx) is already calibrated from IC Maker
- If it needs to adjust manually, refer to appendix
3.2.  MAC Address, ESN, Widevine, HDCP2.0 
key download
(1) Equipment & Condition
1) Play file: keydownload.exe
(2) Communication Port connection
1) Key Write: Com 1,2,3,4 and 115200 (Baudrate)
2) Barcode: Com 1,2,3,4 and 9600 (Baudrate)
(3) Download process
1) Select the download items.
2) Mode check: Online Only
3)  Check  the  test  process  :  DETECT  →  MAC_WRITE  → 
WIDEVINE_WRITE
4) Play: START
5) Check of result: Ready, Test, OK or NG
(4) Communication Port connection
1) Connect
: PCBA Jig → RS-232C Port == PC → RS-232C Port
(5) Download
1) CN/HK models (13Y_H13)
- MAC+ Widevine + ESN + HDCP 2.0 
(6) Inspection
- In INSTART menu, check these keys.
3.3. LAN Inspection(Ping Test)
3.3.1. Equipment setting
(1) Play the LAN Port Test PROGRAM.
(2) Input IP set up for an inspection to Test Program.
*IP Number : 12.12.2.2
Connect SET → LAN Port == PC → LAN Port
3.3.2. LAN PORT inspection(PING TEST)
(1) Play the LAN Port Test Program.
(2) Connect each other LAN Port Jack.
(3) Play Test (F9) button and confirm OK Message.
(4) Remove LAN cable.
SET
PC
Page of 97
Display

Click on the first or last page to see other 55EA9800-CA (CHASSIS:EC34D) service manuals if exist.