50PT85-ZB (CHASSIS:PD74A) - LG TV Service Manual (repair manual). Page 6

Read LG 50PT85-ZB (CHASSIS:PD74A) Service Manual online

- 6 -
ADJUSTMENT INSTRUCTIONS
1. Application Object
These instructions are applied to all of the 50” PLASMA TV,
PD74A Chassis.
2. Note
(1) Because this is not a hot chassis, it is not necessary to use
an  isolation  transformer.  However,  the  use  of  isolation
transformer will help protect test instrument.
(2) Adjustment must be done in the correct order.
(3) The adjustment must be performed in the circumstance of
25±5°C  of  temperature  and  65±10%  of  relative  humidity  if
there is no specific designation.
(4)  The  input  voltage  of  the  receiver  must  keep  100-240V~,
50/60Hz.
(5) Before adjustment, execute Heat-Run for 30 minutes at RF
no signal.
3. Channel memory Setting Method
: You can set channel memory by R/C for adjustment.
1) Press ADJ key of Adjust Remote Controller.(P/N:105-210M)
2)  Select  ‘Channel  Recover’  by  using 
D
/
E
(CH  +/-)  key,  and
press ‘VOL +’.
3) The set is turned off automatically.
4) Press ‘power’ key of Adjust Remote Controller.
4. PCMCIA CARD Checking Method
:  You  must  adjust  DTV  ##(Scrambled)  Channel  and  insert
PCMCIA CARD to socket.
1)  If  PCMCIA  CARD  works  normally,  normal  signals  display
on screen.
But it works abnormally, “No CA module” words display on
screen.
5. POWER PCB Assy Voltage
Adjustments 
(Va, Vs Voltage adjustments)
5-1. Test Equipment :
D.M.M. 1EA
5-2.Connection Diagram for Measuring
: refer to Fig.1
5-3. Adjustment Method
(1) Va Adjustment
1) After receiving 100% Full White Pattern, HEAT RUN.
2) Connect + terminal of D.M.M to Va pin of P805, connect
- terminal to GND pin of P805.
3)  After  turning  VR901,  voltage  of  D.M.M  adjustment  as
same  as  Va  voltage  which  on  label  of  panel  right/top.
(Deviation; ±0.5V)
(2) Vs Adjustment
1) Connect + terminal of D.M.M to Vs pin of P805, connect
– terminal to GND pin of P805.
2)  After  turning  VR951,  voltage  of  D.M.M  adjustment  as
same  as  Va  voltage  which  on  label  of  panel  right/top.
(Deviation; ±0.5V)
Each PCB assembly must be checked by check JIG set.
(Because power PCB Assembly damages to PDP Module,
especially be careful)
(Fig.1) Connection diagram of power adjustment for measuring
<42” EAY3292701>
Page of 32
Display

Click on the first or last page to see other 50PT85-ZB (CHASSIS:PD74A) service manuals if exist.