50PK980-ZA (CHASSIS:PD02C) - LG TV Service Manual (repair manual). Page 6

Read LG 50PK980-ZA (CHASSIS:PD02C) Service Manual online

- 6 -
ADJUSTMENT INSTRUCTION
1. Application Range
This spec sheet is applied to all of the PD02C chassis. 
2. Specification
(1) Because this is not a hot chassis, it is not necessary to use
an  isolation  transformer.  However,  the  use  of  isolation
transformer will help protect test instrument.
(2) Adjustment must be done in the correct order.
(3) The adjustment must be performed in the circumstance of
25 °C ± 5 °C of temperature and 65 % ± 10 % of relative
humidity if there is no specific designation.
(4) The  input  voltage  of  the  receiver  must  keep  100  V  ~  240
V, 50 / 60 Hz.
(5) The receiver must be operated for about 5 minutes prior to
the adjustment when module is in the circumstance of over
15 °C
- In case of keeping module is in the circumstance of 0 °C,
it  should  be  placed  in  the  circumstance  of  above  15  °C
for 2 hours
- In case of keeping module is in the circumstance of below
-20 °C, it should be placed in the circumstance of above
15 °C for 3 hours,.
O
After  RGB  Full  White  in  HEAT-RUN  Mode,  the  receiver
must be operated prior to the adjustment.
O
Enter into HEAT-RUN MODE 
1) Press the POWER ON KEY on R/C for adjustment.
2) OSD display and screen display PATTERN MODE.
- Set is activated HEAT run without signal generator in this
mode. 
- Single color pattern ( WHITE ) of HEAT RUN MODE uses
to check panel. 
- Caution  :  If  you  turn  on  a  still  screen  more  than  20
minutes  (Especially  digital  pattern,  cross  hatch  pattern),
an after image may be occur in the black level part of the
screen.
3. PCB Assembly Adjustment Method
* Caution: Using ‘power on’ button of the control R/C power on
TV.
3-1. MAC Address and CI+ Key.
* Connect  TV  SET  and  PC  which  download  MAC  Address
Writing program by RS232C-Cable
(1) Start  “MAC+CIKeyl.exe”Program  and  Click  (3)  Button  to
connect TV and PC.
(2) Click (4) to download MAC Address.
(3) Click (5) to download CI+ Key.
(4) When download succeed, you can see “OK” on (6)
* Each  Chassis  has  it’  own  MAC  Address.  Please  be  careful  of
download.
3-2. Ping TEST
* This test is to check Network operation.
(1) Press  "Power  on"  button  of  a  service  R/C.(Baud  rate  :
115200 bps)
(2) Connect RS232-C Signal Cable.
(3) Connect LAN cable to MAIN PCB Assembly.
(4) When network operates normally, you can see “OK”. 
3-3.  ADC Adjustment
Auto-control adjustment protocol(RS-232C)
Page of 51
Display

Click on the first or last page to see other 50PK980-ZA (CHASSIS:PD02C) service manuals if exist.