Read LG 42LV5400 (CHASSIS:LA12E) Service Manual online
- 14 -
• Standard color coordinate and temperature using CA-
210(CH 14) – by aging time
1) Edge/IOP LED models
• THX Adjustment (THX certified model only)
Several THX certified models have to adjust White
Balance 5 point at warm mode only.
Balance 5 point at warm mode only.
1) Adjust 100 IRE White Balance
2) Adjust Max Brightness of Back Light Unit to approach
2) Adjust Max Brightness of Back Light Unit to approach
120cd.
3) Adjust Gamma 2.2 IRE(80, 60, 40, 20) with Max
Brightness.
4) Set R, G, B Gain at 10 IRE to 0, 0, 0
5) Complete 5 Point Gamma and White Balance
5) Complete 5 Point Gamma and White Balance
Adjustment
5.2. Tool Option setting & Inspection per
countries
5.2.1. Overview
• Tool option selection is only done for models in Non-USA
• Applied model: LA12E Chassis applied to CANADA and
MEXICO
5.3. Local dimming inspection (Optional)
5.3.1. Edge LED models with local dimming
(1) Press ‘TILT” key of the Adj. R/C and check moving
(1) Press ‘TILT” key of the Adj. R/C and check moving
patterns. The black bar patterns moves from left to right.
If local dimming function does not work, a whole screen
shows full white.
shows full white.
5.4. Ship-out mode check (In-stop)
• After final inspection, press In-Stop key of the Adj. R/C and
check that the unit goes to Stand-by mode.
6. GND and Hi-pot Test
6.1. Method
6.1.1. GND & HI-POT auto-check preparation
(1) Check the POWER CABLE and SIGNAL CABE
insertion condition
6.1.2. GND & HI-POT auto-check
(1) Pallet moves in the station. (POWER CORD / AV
CORD is tightly inserted)
(2) Connect the AV JACK Tester.
(3) Controller (GWS103-4) on.
(4) GND Test (Auto)
CORD is tightly inserted)
(2) Connect the AV JACK Tester.
(3) Controller (GWS103-4) on.
(4) GND Test (Auto)
- If Test is failed, Buzzer operates.
- If Test is passed, execute next process (Hi-pot test).
- If Test is passed, execute next process (Hi-pot test).
(Remove A/V CORD from A/V JACK BOX)
(5) HI-POT test (Auto)
- If Test is failed, Buzzer operates.
- If Test is passed, GOOD Lamp on and move to next
- If Test is passed, GOOD Lamp on and move to next
process automatically.
6.2. Checkpoint
• TEST voltage
- GND: 1.5KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
• TEST time: 1 second
• TEST POINT
• TEST POINT
- GND TEST = POWER CORD GND & SIGNAL CABLE
METAL GND
NEUTRAL
• LEAKAGE CURRENT: At 0.5mArms
Model
Tool 1 Tool 2 Tool 3
Tool 4 Tool 5 Tool 6
42LV5500 32998
4161 7295 21897 8781 665
47LV5500 33000
4161 7295 21897 8781 665
55LV5500 33003
4161 7295 21897 8781 665
42LV5500_AUO 37094 4161 7295 21897 8781 665
55LV5500_AUO 37099 4161 7295 21897 8781 665
Click on the first or last page to see other 42LV5400 (CHASSIS:LA12E) service manuals if exist.